CAREER OBJECTIVE :
A career in dynamic growing organization and to contribute in companies endeavors with perseverance in order to become a top professional
PROFESSIONAL SNAPSHOT :
**Working with M/s IOTIES from 10 Nov. 2007 to till date as a Lead engineer (tank age, piping) at Navgar Terminal expansion Project Navi Mumbai,IOCL Gujarat refinery & MDP Project Bhogat Terminal Jamnagar.
**Working with M/s Punj Lloyd from26 Aug 2005. to 6Nov. 2007 as a engineer (tank age) at Paradeep Haldia Crude Pipeline Project Paradeep Orissa& Petronet LNG Terminal, Dahej, Gujarat
**Working with Vijay Tanks& Vessels (VTV) from 26 Aug.1997 to 22 Aug. 2005.as Tr. Supervisor to Engineer( tank age) at Reliance Petrolium Jamnagar,GAIL PATA (U.P),VTV workshop Baroda, Petronet LNG Terminal,Dahej, Gujarat, IOCL Refinery Panipat.
**Working with EverShine Construction co from May-1996 to Aug-1997 at IOCL, Panipat Refinery.
**Possess better knowledge of inspection & Erection related documents e.g. P & I, GAD, ISOMETRIC and PMS of EIL & ABB.
**ASNT DPT & RT Level II Certified
ACADIMIC QUALIFICATION :
**Passed Matric Exam (10 th) from W. B. Board 0f Secondary Education, Burdwan in 1986 with 70%,
**Passed Inter Mediate from W. B. Board of Higher Secondary Education, Burdwan in 1988 with 47%
TECHNICAL QUALIFICATION :
**Diploma in Mechanical Engineering from W.B. Council of Technical Education(GOVT) Polytechnic, K G Engineering Institute in 1995 with 71%.
EXTRA CURRICULAR ACTIVITIES :
**Adequate Knowledge of computer and its application software e.g. MS excel, MS word,
**Playing cricket.
ORGANIZATIONAL DETAILS :
M/s IOTIES from 10 Nov 2007 to till date as a Lead engineer ( Tank age & piping)
Details : Project – 1
Navgarh Terminal Expansion Project : 03 nos Dome roof Tanks and Piping.
Project – 2 :
IOCL Gujarat Refinery EPCC-6A Project.
17 nos Tanks( Cone roof, Internal Floating Roof Dome roof) and Piping.
Client : IOCL
PMC : Toyoo Engineering.
Project – 3 :
MDP Project Terminal Bhogat, Jamnagar.
07 Tanks (Cone roof ,dome roof) and piping.
Client : Cairn India ltd
RESPONSBILITY :
**Fabrication and lying of annular plate and Bottom plate for 03 Nos. Fuel Tanks.
**Fabrication and Erection of shell plate.
**Installation of cooling system & Foam system of Tanks.
**Fabrication and Erection of curb angle and wind girder.
**Installation of Roof Nozzle & shell Nozzle.
**Periphery handrail installation.
**Erection dismantling Scaffolding arrangement
**Shot blasting and painting operations under controlled conditions using de-humidifier for 03 Nos. tanks.
**Preparation of daily and weekly reports.
**Monitoring of resources deployed on daily basis.
**Preparation of billing invoices as per client payment terms and conditions.
**Maintaining of Quality of works and safety as per norm
ORGANIZATIONAL DETAILS :
Worked as an Engineer (Mechanical) from 2 August 2005 to 09 November 2007 with Punj Lloyd Limited, New Delhi, an ISO 9001, ISO 14001 and OHSAS 14000 Company at Following Project :
**Worked as a Engineer in at Petronet LNG Terminal, Dahej, Gujarat for construction of 02 Nos.
LNG Storage Double Wall Cryogenic Tanks 81 M dia x48.25 M heights.
Project Client : Petronet LNG Limited.
PMC : Foster Wheeler, England /LRIS
**Ishikawajima -Harima Heavy Industries Co. Ltd., Japan
Worked as a Engineer at Paradeep Haldia Crude Pipeline Project Paradeep Orissa In Construction of 07 Nos.Storage Tanks 79 mtrs Dia & 13.5 mtrs Height in Indian Oil Tanking Ltd. under Inspectio of Indian Oil Corporation Ltd from 26 August 2005 to 06 November 2007 .
ORGANIZATIONAL DETAILS :
Worked with VIJAY TANKS & VESSELS LTD., BARODA (An ISO 9001 & ASME ‘U’ Stamp Company) from 10-09 1997 to 25-08**2005. VIJAY TANKS & VESSELS LTD is a 25 Million Dollar company employs more than 500 engineers and is involved in engineering, procurement and construction of storage tanks, pressure vessels, mounded storage facilities (Technical Collaboration with M/s Tissot S.A.France), double wall tanks for cryogenic use, plant product piping jobs and LSTK project
PROJECTS HANDLED SO FAR WITH V.T.V :
**Worked as a Engineer in constriction of 02 Nos. Coke Drum and 01 No. Coker Fraxinator with L&T Hazira Works, ECC Division In at Indian oil corporation Ltd. under EIL Inspection, Panipat Refinery, panipat Haryana
**Worked as a Engineer in construction of 2Nos 10 Mtrs dia x 10Mtrs height Acetic Acid tanks (316L and duplex material).at Indian oil corporation Ltd. under EIL Inspection, Panipat Refinery, panipat Haryana .
**Worked as Dy Engineer in VTV Workshop Baroda in construction of 03 Nos.of Vessels under Inspection of Nuclear Power Corporation of India Ltd Tarapur
**Worked as Dy Engineer in VTV Workshop Baroda in construction of 02 Nos of Vessels under Inspection of Indian Oil Corporation Ltd. Barauni.
**Worked as Dy Engineer in VTV Workshop Baroda in construction of 01 Nos of ASME (U) Stamp Vessels under Worked LRIS Inspection.
**Worked as a Dy Engineer at Petronet LNG Terminal, Dahej, Gujarat for construction of 02 Nos. LNG Storage Cryogenic Tanks 81 M dia x48.25 M heights.
Project Client : Petronet LNG Limited.
Project Management Consultant : Foster Wheeler, England /LRIS
Our Client : Ishikawajima **Harima Heavy Industries Co. Ltd., Tokyo – Japan.
**Worked as a Jr.Engineer at UPPC, GAIL-Pata, Uttar Pradesh, for construction of 9 Nos. LPG / Propane Storage Mounded Bullets 06 M x 99.65M Length under EIL Inspection.
**Worked as Jr. Engineer in construction of 09 Nos floating Roof Tanks 92 mtrs Dia & 20 mtrs Height at Reliance Petroleum Jamnagar Gujarat.
ORGANIZATION DETAILS :
Worked as a Supervisor in Construction of Pipe Racks Structural from May 1996 to August 1997 in Ever shine Construction co. Indian Oil Corporation limited Panipat Refinery, Panipat, Haryana
RESPONSBILITY :
**Prefabrication & Fabrication of Plates for Vessels & Tanks.
**Shell Plates erection by conventional and jacking method.
**Fit up and welding of shell, roof, roof structure, nozzles.
**Bullet segment assembly, bullet field joint fit up and welding.
**Suspended deck assembly, foam glass laying .
**TSR & DCBB set up, tilting and close seam fit up and welding of pressure vessels.
**Fabrication & execution works of shell and cone of SS silos
**Hydro testing of tanks and vessels.