Welcome Guest

Site / Construction >> Fabrication Engineer 
Boiler Fabrication Erection Engineer Resume Sample, Experience : 4 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Boiler Fabrication Erection Engineer
Job related skills / software:IBR / ASME Codes Standards.
Category:Site / Construction
Sub Category:Fabrication Engineer
Years of Experience:4 years
State:Tamil Nadu
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:Diploma
Major / Specialization:Mechanical Engineering
Email Id:[Private]
 
Are you looking for job now?:No
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

OBJECTIVE  :
To work in an competitive environment which should give knowledge and courage to face the any kind of challenges

ACADEMIC PROFILE  :
X GVT HIGH SCHOOL 2003 79.5%
XIIGVT HIGHER SEC SCHOOL 2005 69%
D.M.EC.S.I POLYTECHNIC COLLEGE 2007 85%

PROFESSIONAL BACKGROUND  :
Aug 2007 – Till Date CETHAR LTD, Trichy.

Company Background  :
Cethar Ltd is an ISO 9001 certified company by LRQA. The Company has been accredited to use Prestigious ASME “U” & “S” Stamps. It is a well**known of
** EPC Contractors for Thermal Power Plants
** Traveling Grate Boilers,
** Waste Heat Recovery Boilers
** Oil / Gas Fired Boilers,
** Centrifugal Fans,
** Other Boiler Components,
** Pressure Vessels & Heat Exchangers.
** Manufactures of AFBC & CFBC Type Boilers,

For various Captive Power Plants, Cement, Textiles and various process industries under third party Inspection agencies like Lloyds, & IBR as per ASME & IBR Codes and Standards.

DESIGNATION  : J. E / Fabrication & Erection
List of Projects Handled  :
CLIENT  :M/S BINDAL PAPER LTD,MUZZFERNAGAR PROJECT BRIEF :100 TPH BOILER(AFBC)
DESIGNATION  : Engineer.
JOB INVOLVEMENT  :Boiler Fabrication Erection, Non pressure parts,
Fuel Handling System,ESP

CLIENT  :M/S SELMANUFACTRING LTD,NAVANSHAGAR
PROJECT BRIEF  :50 TPH BOILER(AFBC)
DESIGNATION  : Engineer.
JOB INVOLVEMENT  :Boiler Fabrication Erection, Non pressure parts,
Fuel Handling System,ESP

CLIENT  :M/s SHREE CEMENT LTD,RAS
PROJECT BRIEF  :2 X 25 MW POWER PLANT (AFBC)
DESIGNATION  : Engineer.
JOB INVOLVEMENT  :Boiler Fabrication Erection, Non pressure parts,
Fuel Handling System,ESP

CLIENT  :M/s RAJSHREE PACKGERS LTD,MANGALUR
PROJECT BRIEF  :25TPH Boiler (AFBC)
DESIGNATION  : SITE INCHARGE
JOB INVOLVEMENT  : Boiler Fabrication Erection, Non pressure parts,
Fuel Handling System,ESP

CLIENT  :M/s SBQ STEELS LTD
PROJECT BRIEF  :2X135TPH Boiler (AFBC)
DESIGNATION  : SITE INCHARGE
JOB INVOLVEMENT  : Boiler Fabrication Erection, Non pressure parts,
Fuel Handling System,ESP

CLIENT  :M/s AUROBINDO PHARMA LTD
PROJECT BRIEF  :35TPH Boiler (AFBC)
DESIGNATION  : SITE INCHARGE
JOB INVOLVEMENT  : Boiler Fabr


ication Erection, Non pressure parts,
Fuel Handling System,ESP

CLIENT  :M/s RUNGTA MINES LTD,KOIDA
PROJECT BRIEF  :2 X 20 MW POWER PLANT (AFBC & WHRB)
DESIGNATION  : Engineer.
JOB INVOLVEMENT  : Boiler Fabrication Erection, Non pressure parts,
Fuel Handling System,ESP

Technical Responsibilities :
** Mobilization of various contractors for Fabrication and Erection works in Boiler and ESP in Thermal Power Plant.
** Receive the drawing about Boiler, ESP, Belt conveyor etc.Read the drawing according to that prepares Bill of Materials (BOM).
** Arranging and distribute the raw Materials for making of BOILER and ESP Components and Accessories.
** Allocation of various works in Boiler, ESP & FHS (FUEL HANDLING SYSTEM).
** Following the IBR rules during pressure parts erection in Boiler and also arranges a visit for ground inspection.
** Planning the erection sequence & follow the working activities.
** The work should follow the Safety Working Procedure (SWP).
** Signing of Protocols, Records, Punching check list prior to Hydro test and witnessing the hydro test and hand over to commissioning dept.
** Involve in Preparation of Quality plan & Implemented in various stages of Erection
** Involved in supervision of Erection works of static and Rotating equipments such as feed pumps, fans, blowers etc.
** Assisting commissioning Team in Pre – commissioning

Managerial Responsibilities :
** Involved in site activities, customer co**ordination, Man power management, Project schedule & Implementation
** Planning Man Power resources with required tools, consumables
** Planning the monthly & weekly erection & fabrication schedule
** Co**ordination with consulting management and clients to handover all relevant documents.
** Maintained safety procedures and records conducted safety meeting and audits
** Planned and reviewed daily progress of projects and experienced in implementation of project schedule with effective man power
** Settling of Sub**contractors Bills & Payments.

MANAGERIAL SKILL SET  :
** Effective communication Skill
** Positive thinking Ability
** Analytical Ability
** Quick learner Ability
** Excellent interpersonal skill

AREAS OF INTREST  :
O & M, maintenance

AREAS OF EXPERTISE FABRICATION STRUCTURES,DUCTINGS.ERECTION OF BOILER,ESP,MDC,CYCLONE,BACK FILTER ,FUEL HANDLING SYSTEM AND PRE COMMISSIONING,ALKALIC BOILEOUT, STEAM BLOWING,FAN ALIGNMENT

OTHER SKILLS  :
Communicate clearly and concisely and to interact with senior management officials.
** Work productively and without constant supervision in a team environment.
  Known Platform  : Windows XP
** Design soft ware**Auto cad 2008
** Design soft ware PRO**E

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.