Job Objective :
Success is path not the destination believing this I continuously pursue to Excel in the field of technology and nature my talents to expose the best of me in the demanding corporate world.
Academic Credentials :
Qualification University /Board Year Of Passing Percentage Marks
B.E Mechanical Pune University 2008 67.53%
Dme Msbte 2005 75.24%
S.S.C Pune Board 1999 70.40%
Software Proficiency :
** CAD WORKS Plant Professional -2011.
** CAD WORKS Equipment Professional -2011.
** Navies-Works.
** Auto Cad.
** MS Office.
Technical Skills :
** Knowledge of piping materials.
** Knowledge of pipe support and pipe load calculation for civil.
** Knowledge of Thermic fluid heater house and steam boiler piping.
** Study of Plot Plan, Piping Layout, Equipment Layout.
** Knowledge of checking of piping isometrics.
** Preparation of line list by using P&ID.
** Estimate Pipe rack Loading for civil detailing.
** Knowledge of primary and secondary support and its detailing for high temp and pressure lines.
** Knowledge of Piping MTO,Insulation MTO & Support MTO.
** Knowledge of HDPE piping and its supporting.
** Knowledge Cable Tray and its supporting.
** Knowledge of fuel and coal handling system for heaters.
Experience :
Organization : ARYA ENGINEERS & CONTRACTORS PVT. LTD(Pune)
Designation : Piping / Project Engineer.
Period : From APRIL 2010 to till date.
List Of Projects Handled :
Project Of Thermax Ltd. Pune
1) Indian Strategic Petroleum Reserve Limited (Isprl).
** Prepared Boiler house piping layout with help of P & ID and Equipment Layout .
** Primary and secondary pipe supporting as per stress load.
** Prepared piping specification in CADWORX PLANT-2010.
** Prepared of IBR ISOMETRIC drawings.
** Prepared cable tray layout and its supporting drawings.
2) INDORAMA INDUSTRIES LTD. BIDDI, HIMACHAL PRADESH.
** Prepared Heater house equipment layout.
** Prepared of bulk and final piping MTO with help of Isometrics,piping layout & P& ID.
** Prepared piping specification in CADWORX PLANT-2011.
3) HOSPIRA HEALTH CARE PVT.LTD.
CLIENT : JACOBS ENGINEERING
** Prepared Boiler house piping layout with help of P & ID and Equipment Layout .
** Prepared of IBR ISOMETRICS drawing.
** Prepared piping specification in CADWORX PLANT-2011.
4) WELSPUN INDUSTRIES LTD.
ANJAR ,GUJRAT.
** Prepared IBR approved fabrication drawings of steam header .
** Boiler house piping layout with help of P & ID and Equipment Layout .
** Prepared piping MTO, insulaton MTO and primary and secondary support MTO.
5) GULF PETRO LTD.
** Prepared Heater house piping layout with help of P & ID and Equipment Layout .
** Prepared piping and ducting support fabrication drawing as per BS stdandard.
** Prepared of IBR ISOMETRIC drawings.
6) MICROPOLYPLEX LTD. PANIPAT.
** Prepared Heater equipment layout,piping layout with help of P & ID.
** Piping routing and supporting of stress critical line of 500NB having temp-410 Deg. & PRESSURE 21 bar.
7) RELIANCE INDIA LTD. NAGPUR.
** Prepared Heater equipment layout,piping layout with help of P & ID.
** Piping routing and supporting of stress critical line of 500NB having temp-380 Deg. & PRESSURE 10 bar.
Trans India Engineers Ltd.
Client : - Ampacet Thailand
** Prepared of Plot Plan, Factory inspector drawing,Equipment Layout, piping layout.
** prepared ducting size calculation its support.
** Prepared ducting layout and ducting fabrication drawing for bagfilter.
** Prepared hydrant piping layout.
Organisation :
Unitherm Engineers Ltd. Vartak Nagar, Thane (W.)
Designation : Design Engineer. (Furnace Division.)
Period : 18 August 2008 To 31 Septmber 2009.
Role :
** Development of Heat Treatment Furnaces on Basis of Standard Furnaces.
** In Case of Utility of Services (Gas & oil required For Heat Treatment Process) decide the pipe Route on the Furnace, schema ting piping drawing.
** In case of Electrical Heated Furnaces Preparation of electrical calculation to decide the number of heating coil. And also calculate the number of carboraundum brick.
** In case of pit type furnace design the swing angle (for opening of cover ), lift of cover and accordingly decide the stroke of the hydraulic cylinder .
** checking layout drawing, general assembly, detailing & its Bill of material for calculation of total weight.
Project Handled :
1) Gas Carburizing Furnace : Pit Type Carburizing Furnace, Sealed Quench Furnace .
2) Tempering Furnace : Pit Type Tempering Furnace
3) Wash machine with spray nozzle.
Curriculum Project :
** Project Title : “ Fabrication of vehicle mirror testing rig.
Date :
Place :