Welcome Guest

Design Engineering >> HVAC Designer / Design Engineer 
HVAC Technical Officer Resume Sample, Experience : 11 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:HVAC Technical Officer
Job related skills / software:Review for design drawings and document, Installation of chilled water primary and secondary pumping system, High range Jet fan installation for ventilation systems in Car park.
Category:Design Engineering
Sub Category:HVAC Designer / Design Engineer
Years of Experience:11 years
State:Kerala
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

RESUME  :
Fayas
fayasahakkim AT gmail.com

SKILLS  :
** Well experienced andsoundknowledge in HVAC, , SMACNABMS,GUEST ROOM MANAGEMENT SYSTEMS, For the Large Scale projects in Infrastructure, Commercial and residential Buildings.
** Familiar in international standards ASHRAE, International Plumbing Code (IPC), Uniform Plumbing Code (UPC), NFPA(National Fire Protection Association), ASME, DWetc.
** Proficiency in Qatar Construction Specifications (QCS), Qatar civil defense, Kahraamaregulationsetc.
** Executed the Installation, Testing and Commissioning, Operation &Maintenance of Chillers, Cooling Towers, District Cooling Plant, Heat Exchangers, Air Handling Units, Energy Recovery Units, Package Air conditioners, Fan coil units, Fresh Air Handling Units, Chilled water pumps, VRV Systems, Ventilation Systems, Variable Air Volume, Duct Heaters etc.
** Review of deliverables such asMaterial submittals,IFC Drawings, Shop Drawings,Method statementsand ITPetc. and monitoring for the implementation of work at site respectively.
** Review, evaluate proposals, designs, specifications, bids, contracts, RFI, change orders.
** Preparation of Monthly Interim Valuation Claim ,Negotiation, following up for the certification of the claim.
** Coordination with all statutory authorities for approval of systems.
** Provide engineering support to the Project Engineering Manager with respect to mechanical, electrical, and plumbing systems and ensure successful delivery of projects and handing over to the client.
** Sound Knowledge in HVAC Equipment selection, Pump head calculation, and static pressure calculation for Air handling equipment’s and fans.
** Execution for booster pumps, Transfer Pumps, Sump pumps,De-watring Pumps, GRP Sectional water storage tank, Calorifiers(storage/instantaneous types) and Variety types of fixtures,
** Execution of installation of Diesel pumps, Electric Driven Pumps, jockey pumps, Fire Protection Water Storage Tanks and its downstream equipment.
** Capable for leading a project execution or operation and maintenance team includes Maintenance/Facility Engineers, Supervisors, Inspectors, technicians etc.
** Experienced in Operation and maintenance of the Executed systems in the Projects.
** Receive and review incoming work requests for functioning & maintenance of equipment / system / buildings / facilities and complete the information for required materials, man hours, and skill levels.
** Troubleshoot and analyze technical failures and recommended measures to mitigate recurring problems.
** Developing and implementing Operational / Functional and preventive maintenance programs & procedures to ensure operational efficiency.

PROFESSIONAL EXPERIENCE  :
COMPANY  : THE QATARI MODERN MAINTENANCE Co., AL-FAISAL HOLDING GROUP.
POSITION  : PROJECT ENGINEER
YEAR  : MAY, 2017 TO PRESENT
PROJECT  :ARWA RESIDENTIAL TOWER
CLIENT  : ARTIC (AL-RAYYAN TOURISAM INVESTMENT Co.)
MAIN CON.  : DERWIND CONTRACTING CO.
CONSULTANT  : MEINHARDT SINGAPORE PVT LTD.

** Prepare Man Hours Estimation/Histogram for the Project.
** Followup construction Activities with Construction Engineers.
** Monitoring Daily manpower allocation.
** Track the Works progress at site and ensure which is inline with the Planned Schedule.
** Review of Material Submittals, Shopdrawing and other deliverables.
** Material/Equipment Vendor Selectitos and the Procurement Tracking.
** Responsable for the implementación of the H-VAC system installation at site as per all the Specifications / relevent regulations and Shop drawings in the construction phase.
** Monitoring Installations of Cooling Tower,Heat Exchanger,FAHUs,FCUs,Water cooled Chillers,Primary and Secondary Pumps,Condensed water circulating Pump,Basin Filtration,Primary and secondary Chilled water Pumps, Booster and transfer Pumps,GRP water storage Tank,Calorifiers,Water Heaters,Waste water recovery Plant, Fire Pumps,GRMS,BMS,Fire Alarm etc.
** Coordination for interfacing of GRMS, BMS, FA with Mechanical Systems Installations.

COMPANY  : THE QATARI MODERN MAINTENANCE Co.(AL-FAISAL HOLDING)
POSITION  : PROJECT ENGINEER (H-VAC SYSTEMS)
YEAR  : JULY, 2014 TO MAY, 2017
PROJECT  :HAMAD PORT PROJECT/NPP-0026 CONTAINER TERMINAL-1 (CT-1) SEWAGE TREATMENT PLANT 1 & 2 (STP 1&2)
CLIENT  : NEW PORT STEERING COMMITTEE, QATAR Govt.
MAIN CON.  : CCC-TCC JV.
CONSULTANT  : AECOM (PROJECT MANAGEMENT CONSULTAT) / WORLEY PARSONS (ENG. DESIGN CONSULTANT).

** Responsable for the implementación of the H-VAC system installation at site as per all the Specifications / relevent regulations and Shop drawings in the construction phase and Testing the Performance of the system inline with the design parameters during T&C Phase.
** To lead the team of Project to Ensure the Timely deliverables and toachievethe Project Miles tones.
** Prepares Man Hours Estimation/Histogram for the Project.
** Daily Deployment of Site Team and assign their Tasks.
** Track the Works progress at site and ensure which is inline with Planned Schedule.
** Material/Equipment Vendor Selectitos and the Procurement Tracking.
** Responsable for the implementación of the H-VAC system installation at site as per all the Specifications / relevent regulations and Shop drawings in the construction phase and Testing the Performance of the system inline with the design parameters during T&C Phase.
** Installation of Aircooled Chillers, Chilled wáter Pumps with Variable Frequency drives, Fresh Air Handling Units, Energy recovery units with Heat recovery Wheel, Pressure Independent Variable Air Volume units, Steam Humidifiers, Duct Heaters, Air curtains etc.
** Monthly evaluation Claim and Variation Claim
** Liaise with Consultant on Technical Conflicts.
** Support for BMS Integration with all the H-Vac Equipments.
** Support for F.A integration with H-Vac Equipments.

COMPANY  : AGA-MEP CONTRACTING & ENGINEERING QATAR L.L.C
POSITION  : Sr.MECHANICAL ENGINEER (BUILDING SERVICES)
YEAR  : JULY, 2011 TO 2014
PROJECT  : DOHA NORTH SEWAGE TREATMENT PLANT
CLIENT  : ASHGAL (PUBLIC WORK AUTHORITY)
MAIN CON.  : KEPPEL SEGERS ENGINEERING SINGAPORE PVT LTD.
CONSULTANT  : KEO INTERNATIONAL/STANLEY CONSULTANTS.

Summary  :
** Supervision for All MEP building services.
** Pump head calculations for Chilled wáter pumps, Domestic Water supply Pumps, booster and transfer pumps.
** Total head calculation for submersible pumps, booster pumps etc.
** ESP Calculations for Air handling units and fans.
** Execution of HVAC, Fire Protection, Potable Water, Sanitary And Wash Water Systems.
** Installation of Aircooled Chillers, Primary and secondary Chilled water Pumps with a wide network of pre-insulated underground Chilled water piping.
** Installation of VRV (Variable refrigerent volume), AHUs, FCUs, DX Units, RTUs and Chillers.
** Erection of booster Pump set with a head of 50.65 metre and 27.9 litre/second capacity for central potable water pumping station.
** Installation Fire Protection Diesel/Electrical Driven/jocky Pumping systems and fire water storage tank inorder to fullfill the design requirement for the Fire Protection Systems in the entire plant.
** Installation of FM-200, Fire Alarm, Deluge, Sprinklers, Wet & Dry Hydrant systems Installations.
** Installation of Ventilation Systems at Utility buildings.
** Pressure Vessels And GRP Sectional Water Storage Tank for central pumping station according to the specifications and the design drawing.
** Welding Works (TIG/ARC) according to approved WPS, for chilled water piping and fire fighting piping.
** Attend weekly progress meeting.
** Conduct inspections according to approved ITP.
** Preparation of daily reportes to Project manager.
** Execution of a wide range of pipes like C.S, D.I, Cu, S.S, u-PVC, PP-R etc.


with different joining methods.
** Installation of GRP, Aluminium, Blacksteel and G.I Ducts.

COMPANY  : ENERMES ENGINEERING QATAR W.L.L.
POSITION  : PROJECT ENGINEER (HVAC SYSTEMS)
YEAR  : SEP, 2009 to JULY 2011
PROJECT  : MERQAB MALL
CLIENT  : MERQAB COMMERCIAL DEVELOPMENT.
MAIN CON.  : TERNA QATAR.L.LC
CONSULTANT  : ARAB ENGINEERING BERUE/DARA ENGINEERING.

COMPANY  : ENERMES ENGINEERING QATAR W.L.L.
POSITION  : MECHANICAL ENGINEER.
PROJECT  : VIVA BAHRYA VP 20 & VP 21 TOWERS AT PEARL QATAR
CLIENT  : THE PEARL QATAR.
CONSULTANT  : KEO INTERNATIONAL

Summary  :
** Installation of HVAC systems with 5500TR Capacity in Merqab commercial Development.
** 20 nos of Air-cooled chiller units, 240 AHUs, 150 FCUs, and split a/c units.
** Review for design drawings and document.
** Installation of chilled water primary and secondary pumping system.
** High range Jet fan installation for ventilation systems in Car park.
** Smokes extract systems installation systems for FOOD & BEVERAGES areas.
** Potable water system installation.
** Drainage systems installation.
** Booster pumping systems installation.
** Installation of chilled water primary/secondary pumps installation.
** Preparation of Bar chart/Workshop drawings. (In line with specification requirements.)& approval from consultant.
** Approval of submittals. (In line with specification requirements.)
** Ordering of materials & follow up, to meet scheduled targets.
** Attending technical meetings.
** Manpower requirements/Distribution towards construction.
** Constant monitoring, measuring project progress.
** Payment invoice, related to project progress and delivery of materials.
** Coordination during Testing /Balancing/Commissioning with vendors.
** Sizing of chilled water and refrigerant pipes based on velocity friction.
** Making submittals of equipment/material for approval, to consultant.
** Preparation of drawings and approval of same from Client/consultant, like –
** Chilled/condenser water piping layout drawing, showing size of chilled water pipes,
** Location of gate/butterfly/double regulating valve, strainer, air vent, mixing/modulating valve, coupling etc.

COMPANY  : AERODECK ENGINEERS PVT LTD.CHENNAI,INDIA
POSITION  : MECHANICAL ENGINEER
PROJECT  : TIDEL PARK, COIMBATORE, INDIA
YEAR  : 2007-2009

Summary  :
** Chilled water pipe sizing/selection on the basis of pipe selection chart.
** Ducting design on the basis of international standards.
** Pumps head calculation and selection of the pump according to the requirement of the project.
** Preparation of material bill of quantities, Preparation of material request, Material procurement and vendor finalization.
** Preparing and obtaining drawing and material submittals approval from the Consultant,
** Static pressure calculations for air-handling units/Fan coil units, exhaust fans, fresh air fans etc.
** Responsible for preparation of shop drawings for the site execution.
** Responsible for site execution of Equipment’s like chillers, chilled water pumps, Air handling units, fan coil units, Different kinds of fans etc.
** Welding supervision for C.S Pipes.
** Preparation of workshop drawings co-ordinate with arch. Drawings.
** Coordinating with other Sub-Contractors to provide solutions affecting design developments / coordination matters.
** Preparation of work schedule.
** To coordinate material issuance and usage at site.
** Review of daily, weekly &monthly reports and reporting to project engineer.

EDUCATION :
B.E Mechanical Engineering. First Class Anna University-Chennai India.
Diploma in mechanical CADD
Institute  : CADD Centre, Trivandrum-India.

PROFESSIONAL TRAINING ATTENDED  :
** Certificate in programming and operation in CNC Lathe and milling m/c from small scale entrepreneur promotional training institute (SEPTI), India
** Undergone training for Safe Lifting Procedure conducted by Bearue VERITAS Qatar.

SOFTWARE SKILLS  :
** HAP & Block load software of Carrier brand (HVAC design and load calculation),
** Duct sizing software’s,
** MS Project 2007
** AutoCAD 2010,
** Primavera
** AutoCAD.
** Pro-E.

COMPUTER SKILLS  :
** Microsoft Windows XP, Vista 7
** Microsoft Office word, excel, project etc.

LANGUAGES :
English, Hindi, Tamil, Malayalam, Arabic

PERSONAL INFORMATION :
Age & Date of Birth : 31, 4th April 1985.
Religion & Caste : Muslim, Islam.
Nationality : Indian.
Gender : Male.
Blood Group : B+ve.
Marital Status : Married.
Strength : Hard working, Self-confidence, Patience.

DATE :
PLACE :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.