Biodata |
|
Name of the Candidate | : | [Private] |
Name of the Post Applied | : | Electrical Design Engineer |
Job related skills / software | : | MATLAB Simulink, Electrical Wiring, Basic Circuit Knowledge, Transformer Testing |
Category | : | Design Engineering |
Sub Category | : | Electrical Design Engineer/ Draftsman |
Years of Experience | : | 0 years |
State | : | Telangana |
Gender | : | Male |
Salary Expected per Month(Rs) | : | 25,000 to 30000 |
Highest Qualification attained | : | B.E. / BE : Bachelor of Engineering |
Major / Specialization | : | Electrical and Electronics |
Email Id | : | [Private] |
|
Are you looking for job now? | : | Yes |
Can the recruiter contact you? | : | Yes |
Sponsored Links:
|
Resume Format / CV Sample Template / Example / Model : |
|
Mirza Rahman Baig
Email : mirzarahmanbaig26 AT gmail.com
Career Objective :
To evolve into a capable professional by being associated with the company that will challenge me to push my boundries and allow me to use my education and skills in a way that is mutually beneficial for my employer and me and achieve a sustainable growth in life.
Alma Mater :
Bachelor of Engineering :
Electrical and Electronics Engineering
Deccan College of Engineering and Technology, Osmania University Aggregate : 75%
Year of Passing : 2019
Diploma :
NSAK College Aggregate :82%
Year of Passing : 2016
Secondary School Education :
Angels Convent High School Aggregate : 77%
Year of Passing : 2013
Technical Skills :
** MATLAB Simulink - Basic
** Electrical wiring
** Basic Circuit Knowledge
** Transformer Testing
** Distribution Boxes Assembling
** Transformer laminatted core assembling
** AutoCad - Basic
** MS Offfce - Basic
Projects :
Project 1 : Three phase fault analysis with auto reset on temporary fault and permanent trip otherwise
Description :
** It develops an automatic tripping mechanism for the three phase supply system.The project output reset automatically after a brief interruption in the event temporary fault while it remains in tripped condition in case of permanent fau
lt
** The major advantage of this project is it will not only save the appliance but it will also check whether the fault is permanent or temporary.If the fault is temporary then the supply will be restored after a predefine time otherwise permanent trip signal is given to the relay.
Project 2 : Renewable Hybrid power plant
Description :
** The Hybrid power plant consist of three power stations used majorly around the world i.e Solar power plant, Hydro power plant and wind power plant.
** The load is connected to a grid which is connected to three power stations.If a fault occur in either of power station the power will be distributed to the load by rest of the stations either manually or automatically.
Internship : Hyderabad Instrument Transformers:
** 6 months Internship
Roles and Responsibilities during Internship :
** Transformer testing
** Marshalling box assembling
** Distribution box assembling
** Transformer laminatted core assembling
Co-Curricular Activities :
** Intern in Hyderabad Instrument Transformers.
** Worked in Electrical workshop to gain tecnical knowledge.
** Awarded first prize in open house competition for making hybrid power station.
** Certification for participating in Green day revolution.
** Awarded first prize for carrom competition.
Declaration :
I, Mirza Rahman Baig do hereby confirm that the information given above is true to the best of my knowledge.
Date :
Place : Hyderabad.
|
|
Notes |
1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.
|
|