Welcome Guest

Site / Construction >> Project Engineer / Manager 
Thermal Power Plant Project Manager Resume Sample, Experience : 16 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Thermal Power Plant Project Manager
Job related skills / software:Construction of Boiler and Maintenance, Thermal Power Plant Engineering, Planning and execution of site Construction activities
Category:Site / Construction
Sub Category:Project Engineer / Manager
Years of Experience:16 years
State:Telangana
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

Govindula Odelu
E-Mail  : - govindula2009 AT gmail.com

Objective  :
Seeking assignments in Project Management/Erection & Commissioning/Operation & Maintenance of Thermal Power Plant and Solar Plant with an Oriented Organization.

Professional Summary  :
Experience Chronology  :
Organization  : Adani Power Ltd.
Construction Project  : Tiroda 5x660 MW, 1.6GW Mundra EMC Project, 20MW Solar Plant Holenarsipura – Karnataka
Role  :- Project Manager
Duration  :Aug 2011 to Till date

Responsibilities  :
** I have handled site construction teams Max Strength of 20 no’s
** Experience in managing project budget within the project timelines
** Ability to handle both HO and Site teams
** Planning and execution of site Construction activities.
** To ensure availability of required manpower at site and material follow-up until the completion of activity.
** Ensuring quality assurance, safety and environment standards.
** Vigorous follow-up and coordination between Internal Departments & Contractors.
** Erection, testing and commissioning of Boiler & Auxiliaries as well as O&M of CHP and AHP
** Erection and Testing Commissioning of Boiler & Accessories Furnace, Economizer, Super Heater, Re-heater, Back Pass, Bottom Ash Hopper, Soot Blowers, Separators, Ext Walls, Divisional Walls etc.
** Erection of Boiler and Bunker Structure & Shell, Internal Piping(HFO, LDO, Instrument Air, Service Air, CCCW, Mill Inert line,N2 Line, Cooling Air Line, Scanner Airline).
** Erection of Boiler Auxiliaries (APH, Coal Mills, FD, PA, ID Fans Scanner Air, Seal Air Fans, BCP Pump, Coal Pipe, and Feeders).
** Hydro Test, Chemical Cleaning, Steam Blowing, Air Tightening Test for Pressure Parts, Internal Piping, Coal Pipe and Feeders.
** Ensure that proper training given to subordinates.
** Monitor, Review & follow-up of the relevant packages as per the project schedules and Ensure resource based planning for each concern package.
** Regular review of Weekly Safety Audits, Motivation of workers in-order to improve Safety standards at Site and ensure Safe working conditions. OHSAS Compliances are rigorously followed.
** Involving in monthly brainstorming sessions within department for improved performance.
** Updating and maintaining records to ensure compliance of ISO 9001.
** Take part in the everyday meeting with Subcontractors and discuss next day activities.
** Material Management using SAPS i.e. creation of requisitions and approvals using Purchasing functions.
** Inventory Management which includes issuing, transferring, restocking, counting and adjustment in the processes of inventory, consumption booking and project closing activities.

Achievements  :
** Successfully completed Super Critical Boiler Construction and Hydro Test within 12 months.
** Successfully completed Boiler Light-Up, Steam Blowing and COD within 100 days.
** Successfully completed 1.6GW EMC Project Construction within One Year.
** Successfully completed 20MW Solar Plant Construction within 6 months.

Organization  :Lanco InfraTech Ltd,
Project  :Amarkantak - Korba, 2*660MW.
Role  :Deputy Manager
Duration  :Sep’2010 to Aug’2011

Responsibilities  :
Erection and testing of Boiler & Auxiliaries 2*660 MW Unit.Fabrication, Welding, Pre-Assemble and Erection of ESP with Quality and Safety stands follow-up.

Organization  : Larsen & Toubro Limited,
Project  : Adani - Mundra 5*660MW, JSW -Barmer 8*135MW, Vedanta-Jharsuguda 4*600MW,
Role  : Package In charge
Duration  :Sep’2007 to Aug’2010

Responsibilities  :
Assistant Construction Manager for erection of Boiler Pressure Parts, Study the Process & Instrumentation Diagrams (P & IDs) and System Design Philosophy ,coordinate with planning section so as to get required documents needed for erection,testing.Prepare Review Notes for Monthly coordination meetings at progress monitoring, client and owner level.

Handled Projects :
At Adani - Mundra 5*660 MW Site :
India's First Super Critical Boiler erection and hydro test completed within time.

At JSW-Barmer 8*135 MW Site :
** Erection and Hydro Test of Unit-1 pressure parts successfully completed within 10 months.
** Recognized for working overnight and successfully decreased the project schedule length and cost.
** Received acknowledgement & appreciation amount in 2008 for excellence in performance

At Vedanta-Jharsuguda 4*600 MW Site :
** Completed erection of Unit-2 Boiler Structure Unit of 600 MW within 5-Months.
** Completed erection of 75T & 40T Tower Cranes within 2-months.

Organization  :HEG Limited (LNJ Bhilwara Group), Durg – Chhattisgarh
Project  :Operation of 25MW (AFBC) Power Plant.
Role  : Shift Engineer / Shift In-Charge
Duration  : Jun’2006 – Sep’2007

Responsibilities  :
** Implementing affecting preventive & predictive maintenance schedules of various machinery and instruments to increase machine up time / equipment reliability thereby accomplishing planned production targets within the budget
** Managing operations & maintenance of power generation unit, Cold start-up and Cold shut-down & hot start-up and hot shut-down Boiler at the thermal power plant.
** Proactively identified areas of obstruction / breakdowns and taken steps to rectify the equipment through application of troubleshooting tools.
** Functioned in the Power Plant Operation of 25MW (AFBC & WHRB) Boiler and Turbine.
** Reporting on a day to day basis to the President - Operations
** Familiarized with Operations start-up and shut-downs and process.

Organization  :Indwell Construction Pvt Ltd
Project  :Sanjay Gandhi Tape Vidyute, MPEB-BirsinghpurPali - 1*500MW.
Role  : Field Engineer
Duration  :Apr’2003 to Aug’2005

Responsibilities  :
** As a Site Engineer erection of Boiler Pressure Parts 500 MW Unit, Manufacturer and Supplier by BHEL
** Successfully completed erection of Boiler Pressure Parts within 16 months.

Academia  :
Post Graduate Diploma Certificate (PGDC) & Boiler Operating Engineer certificate (BOE) in Thermal Power Plant Engineering from National Power Training Institute (NPTI-Nagpur), from Maharashtra State in 2006.


(Under the Ministry of Power, Govt. of India). An ISO 9001  :2000 & 14001 organizations.

Education  :
Bachelor of Technology (Mechanical Engineering) from Jatipita College of Engineering, Adilabad affiliated to JNTU in 2003.

Personal Dossier  :
Date of Birth  : 16th March 1979,
Known Languages  : English, Hindi, and Telugu
Marital Status  : Married with loving two sons

Date  :
Place  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.