Curriculam Vitae :
Name : Sandeep Singh
Father Name : Late Sewa Singh
Date of Birth : 15th Dec 1992
Nationality : Indian
Marital status : Married
Profession : Surveyor
Religion : Sikh
Language Known : Hindi, English, Punjabi, Bengali, Nepali
E-mail address : sandeeps97 AT yahoo.com
Educational Qualification :
SSC From W.B.B.S.E
Technical Qualification :
** Diploma In Civil Engineering form Maharashtra Computer & Technical Education Board, Nagpur.
** Diploma in AutoCAD for Architects and Civil Engineers from Cad Centre.
Software Known :
AutoCAD, MS office (Word, Excel) and Google earth
Operating System :
Window 2007 and Window 2010
Professional Experience :
Having 5 years professional experience as a surveyor in the field of transmission line and 3 years’ experience in distribution projects.
Employment Record :
Abir Infrastructure
August 2011 to February 2012
Mangan to Kishanganj 400kV Quad line unequal foundation.
TPTL SIKKIM Shyama Power India Limited
March 2012 to June 2016
Rangpo to new Melli 220kV D/C unequal foundation.
PGCIL SIKKIM
** LILO of 400kV Teesta-V to Siliguri unequal leg extension with raised chimney.
** LILO of 400kV Teesta-III Mangan to Kishanganj unequal foundation.
** LILO of 132kv Chuzachen to Gangtok line.
** LILO of 132kV Rangit to Gangtok line.
** Sunda to Hatkoti 220kV D/C line.
HPPTCL HIMACHAL PRADESH EMC Limited
July 2016 to September 2016
Winjhar to Hinjewadi 400kV D/C line.
MSETCL MAHARASTRA
TATA Projects Limited
Oct 2016 to till date
IPDS - Patna, Project
SBPDCL BIHAR
Instrument Handled :
** Nicon-352 (TS)
** Soikia (TS)
** Topcon (TS)
** FOIF (TS)
** Auto Level
** Dumpy Level
** Hand GPS
** Theodolite
Job Responsibility in Transmission line :
** Full knowledge of all kind survey for transmission line like route alignment, detail survey, check survey and contouring.
** Preparation of tower schedule.
** Knowledge of Prop setting, revetment proposal, benching proposal and foundation work.
** Preparation of power line crossing proposal.
** Making forest proposal.
** Coordinating with client for all survey related work and preparation of all type documents to related survey.
Job Responsibility in Distribution line :
** Survey of Proposed electrical Networks, like LT line, 11kV feeder, 33kV feeder, distribution transformer of different rating, consumer indexing.
** Preparation SLD of electrical network in AutoCAD.
** Preparation BOQ of survey and getting approval from client.
** Preparation GA drawing for HT and LT line.
** Preparation of electrical layout and civil layout of 33/11kV GIS & AIS power substation.
** Prepare pole schedule, JMC summary sheet and reconciliation.
Declaration :
I declare that the information stated above is true to the best of my knowledge.
Date :
Place :