RAJAPRIYA G
INSTRUMENTATION DESIGNER
Email : genpriya AT gmail.com
OBJECTIVE :
To securechallenging assignments as a professional in the field of Instrumentation& Control Engineering. Where I can grow along with the organization with great responsibility.
CAREER SUMMARY :
Having 6.3 years of experience in the field of design engineering of Oil & Gas projects Involved in Detailed Engineering & Design of offshore projects in Instrumentation Department like 3D Modeling, Layouts, Wiring and checking using software tools.
EDUCATIONAL QUALIFICATION :
Diplomain Instrumentation and Control Engineering (2013) from Dr.Dharmambal Government Polytechnic College for Women, Chennai.
SOFTWARE SKILL :
** PDS - 3D- Electrical Raceways, Equipment modeling, Drawing Manager.
** Aveva PDMS - 3DModeling (Draft).
** SPR– Smart Plant Review,
** E-3DSoftware.
** Aveva Instrumentation version 12.0
** IntoolsSmart Plant Instrumentation
** AutoCAD, MS office,
** Microstation, Orthogen software
** SP3Dsoftware.
EXPERIENCE :
June 2019 to Till now Mcdermott -Chennai
Projects Involved and Job Responsibilities :
** TYRA REDEVELOPMENT PROJECT – WHRP (Offshore)
** Preparation of Instrument Termination Diagram Using AVEVA.
** Preparation of Instrument Loop Diagram Using AVEVA.
** Preparation of Instrument Cable Block Diagram.
Oct 2018 to May 2019 KBR -Chennai
Projects Involved and Job Responsibilities :
** Safaniyah Onshore Project (As-Built)
** Preparation of Instrument Index & Instrument Data Sheet Using SPI.
** Preparation of Instrument Wiring Diagram Using SPI.
** Preparation of Instrument Loop Diagram Using SPI.
June 2013 to Sep 2018 Woodplc -Chennai (Formerly Foster Wheeler India Pvt. Ltd)
Projects Involved and Job Responsibilities :
** Assiut Petroleum Refining company (ASORC) – Egypt
** 3D modeling using PDS (Instrument Cable Trays, Instrument Junction box, Fire & Gas device).
** Preparation of Cable Tray Routing drawing
** Preparation of Instrument Installation Diagram.
** Preparation of Instrument & JB location Diagram
** Preparation of Instrument Wiring Diagram Using SPI.
** Preparation of Instrument Loop Diagram Using SPI.
** Preparation of Instrument Cable and Gland MTO.
** Preparation of Instrument Tray MTO Using PDS.
SONATRACH Project Nouvelles Refineries, Tiaret, Hassi, messaoud, ALGERIE
** Preparation of F&G Location Layouts.
** Preparation of Instrument Cable list.
** Preparation of Junction Box Grouping
** Preparation of Instrument Cable Trench Routing Layouts.
SOCAR, HAOR Modernization Feed Project, Baku, Azerbaijan
** Preparation of F&a
mp;G Location Layouts.
** Preparation of Instrument Cable list and JB Grouping.
** Preparation of Instrument Cable Routing Layouts in Auto-CAD.
BPLPG Chill Down Project, British Petroleum – Offshore Project
** PDMS 3D to 2D Extraction activities and preparation of Instrument Cable Racking Layouts, Instrument / F&G Location Layouts, Instrument Cable Routing Layouts in Auto-CAD.
** Extraction of Junction Box Termination Drawings, Termination Marshalling Drawings in Auto-CAD from AVEVA Instrumentation Designer Module.
** Extraction of Instrument Loop Drawings in Auto-CAD from AVEVA Instrumentation Designer Module.
Montrose BLP, Talisman Sinopec Energy, Aberdeen, UK
** Preparation Instrument location plan.
** Preparation of Cable block diagram.
** Preparation of Termination diagram.
** Preparation of Cable routing diagram.
** Preparation of Interconnection Diagrams.
Enterprises-Propane De-Hydrogenation Unit, Enterprises, Houston, Texas
** Extracting Instrument Location Plans with the help of Orthogen and converting from 3D to 2D Drawings.
** Drafting the instrumentation design drawings Junction box wiring diagram,
Reliance Paraxylene PX4 Train Project, Reliance Industries ltd, Jamnagar– Petrochemical
** Preparation of Typical Instrument Installation Diagram
** Preparation of Fire and Gas Instrument Location Plan
** Preparation of Cable schedule
** PDS 3D to 2D Extraction activities and Preparation of Instrument Location Plan / Fire and Gas Instrument Location Plan in Microstation V7.
Statoil Onshore Gas Security Project, Norway, Europe
** Co-ordinate with UKTeam(Galsgow) for the required input and necessary clarification for below mentioned C&I Design Deliverables.
** Instrument Cable Black Diagram
** Instrument Control Room layout
** Telecom Equipment Cabinet GA drawings.
Swan LNG Jetty Topside FEED Project,Swan Energy limited, Jafrabad, India
** Preparation of Typical Instrument Installation Diagram
** Preparation of Cable Routing Layout
** Preparation of Fire and Gas Instrument Location Plan
** Preparation of Control room Layout
** Preparation of instrument Architecture Diagram.
TOTAL Rafinaderij - Optara lot 3A EPC Antwerp, Belgium
** Preparation of Instrument Installation Diagram (Process, Pneumatic, Electrical, Support)
** Preparation of Fire and Gas Instrument Location Plan
** Preparation of Instrument Cable Tray Layout
** Preparation of Instrument cable and Coil list.
** 3D modeling using PDS (Junction boxes)
Personal Details :
Father's name : Ganesan R
Date of Birth : 04.06.1993
Marital status : Single
Nationality : Indian
Languages Known : English, Tamil
Declaration :
I hereby declare that the above details are true to my knowledge and belief.
Place : Chennai
Date :