Carrier Objective :
To get a mid management post in reputed Group
Educational Qualification :
Diploma in Civil Engineering from UP Technical Education Board Uttar Pradesh
BTech in Civil Engineering from JRN Rajasthan Vidyapeeth University
Intermediate from UP Education Board Allahabad
Working Experience : Twenty Years
August 1999 to till Date :
Working as a Head of Department Survey in a MNC (LNJ Bhilwara+SN Power Stat Kraft Norway JV)
Present Location : Manali :
Name of Company Name of Project Cost of project
Indo Canadian Consultancy Services AD Hydro Power Project IR : 1800 Crore (Sister Concern of LNJ Bhilwara Group)
Project includes :
Allain Duhangan Hydro Power Ltdhas constructed 192MW Hydroelectric Project a run of river scheme in Himachal Pradesh on Build, Own, and Operate & Transfer(BOOT)basis for 40 years Project includes development of infrastructure Roads, Residential Building Office Building, construction of Hydro-structures (Diversion Barrage, Head regulator & allied structure, Head Race Tunnel, Pressure Shaft, Underground Power House and Tail Race Tunnel etc)With Estimated cost of Rs1800crores
LNJ Bhilwara group has been commissioned and constructed 86MW Hydro-Electric Project in record period of 30 Months on river Malana a tributary of river Parvati in Kullu Distt(Himachal Pradesh)
Job Profile :
Primarily survey and final topographical survey of Allain Duhangan Hydro-Electric Project & Malana Hydro Electric Project area which includes Layout map of Project area, contour survey of project components ie Power House, Penstock, Head Race Tunnel ,Surge Shafts, Barrage, Head regulator, Desilting chambers
X, Section along Tunnel alignment, hydro-graphic survey of Allain Duhangan River
Survey of Allain &Duhangan road alignments (28Km), X-sections along road alignment
Giving control points to the contractors for different component
s of work (power House, Penstock, and Barrage Head regulator, Desalting chambers, Head Race Tunnel, Surge Shafts, Tunnel Portals)
Taking routine measurements of work done by the contactor
Estimation of different items of work
And also involved in the execution and survey of under ground works
As a consultants a number of minis & micro Hydro Electric Project are identified & some detailed survey carried out in above period which are as follows :a) Tarila Hydro Electric Project – 5 MW at Distt Chamba
b) Balsio Hydro Electric Project – 35 MW at Distt Chamba
c) Kurpan Hydro Electric Project 5 MW at Distt Kullu
d) Baragran Hydro Electric Project 5 MW at Distt Kullu etc
From July 1991 to July 1999 :
Organization : Map-Age Consultants
Nature of work :
Topographical Survey& under ground survey of Tehri & Koteswar Dam Project (2400 MW)
Topographical Survey of Delhi Metro Rail Corridoor from Kishangang to Dayabasti (4km), Dayabasti to Sakurbasti to Nagloi, Azadpur to Khera Kala, Khera Kala to Holimbikala, Shastri nagar to Barwala, Chadni Chowk to Cocnaught Place
Final rail alignment for DMRC from Shahadra to Nagloi (24km)
Rail alignment from punllur to Kottayam Section, Kottayam to Sabrimala section in Kerla(RITES)
Gas pipe line alignment of Bharat Oman Gas pipe line (120 km)project in Gujarat For GAIL
Topographical Survey of Enron project&Dabhol to Hazira Gas pipe line alignment marked on ground (250km)
Gas pipe line alignment marked on ground from Kandala to Payala (260 km GAIL)
Topographical survey of many mini µ hydro Electric Project in Himachal Pradesh, Uttranchal & Sikkim state
During above said period involving construction of residential building & Road works
Instrument used :
All types of survey instrument are used in above said period
Declaration :
I hereby confirm that the information furnished above is correct to the best of my knowledge
Date : ___________
Place : ___________