Currently I was working in Power Mech Projects Limited as a Sr. Project Engineer
Project : Phase #2 10MPTA Expansion Project
Unit : Gas Based Captive power Plant (TG-2) & Pellet Plant
Client : Intra Tech
Costumer : JSW Dolvi Works
Period : (September 2018 To November 2019
Responsibilities :
** Full responsible for providing the client services, date, reports, other necessary to complete the work within the required safety condition, established cost budget and scheduled completion date.
** Plan and conduct all the related activities to accomplish project timely, with quality, safety as committed.
** Reviews and approves official letters, drawing, documents for erection purposes.
** Allocate Resources as required and ensure Resources are properly qualified.
** Installation schedule planning “Sequence/Method of Erection”
** Ensure the adequate plans and actions to solve out all the complaints from the clients.
** Check and record all the required test and inspection documents.
** Plan and schedule material, equipment and personnel to perform the work.
** Coordinate all installation, delivery, and safety activities at site.
** Implements and maintains a safe working environment by adhering to correct work practices and procedures.
** Make the appropriate “Method Statement” to submit to Project Manager.
** Ensures all necessary checks, inspections and tests are carried out and passed before proceeding to the next stage of installation. And outgoing materials from site.
** On behalf of the Project manager on site to decide the issues with his assigned authority.
** Ensures that the work is carried out on site safely.
** To monitor all site staff to carry out the Project effectively
** Perform risk assessment, Review drawings, Specifications
M/s. Satnam Global Infraprojects Limited :
As a Sr. Piping Engineer
Project : vasishta V1 & S1 Project, Odalarevu (ONGC),
Client : Technip fmc
Consultancy : VCS Quality Services Pvt. Ltd
Costumer : Oil & Natural Gas Corporation (ONGC)
Period : (From October 2016 to September 2018.)
Responsibilities :
** Responsible for erection of Steel Structure, Piping & Pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings
** Responsibility for Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics
** Test Package Contents, Test Limits, Including Drawings, Test Results, Check Clients Required Documentation.
** Assist Design Department in solving Piping Modification and Technical Problems in the Field.
** Provide technical answers to Engineering Queries raised up by the subcontractor confirming design drawings and standard requirements.
** Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.
** Carrying out final P&ID check of installed piping systems in the module.
** Preparation of “AS BUILT” drawings.
** Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
** Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
** Ensure that hydro test reinstatement is to be done as per procedure
** Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.
** Reconciliation of materials Maintaining the daily progress on database system. Preparing one week look ahead progress. Monitoring and follow up of day to day progress activities.
M/s. Zillion Infraprojects Private Limited :
As a Project In-Charge :
Project : 750 Mw capacities (3x250 Mw).
Bongaigaon thermal power project (TPP) Kokrajhar, Assam.
Client : National Buildings Construction Corporation Ltd. (NBCC)
Consultancy : National Thermal Power Corporation Limited,
Areas of expertise : Fabrication and Erection of Structural Steel of Bunker & TG Unit
Period : (from November 2014 to September 2016.)
M/s. Zillion Infraprojects Private Limited :
As a Site In-Charge :
Project : TATA Steel Kalinganagar Plant- Jajpur, Odessa.
Client : Gayatri Projects Limited.
Consultancy : MN Dastur & Company (P) Ltd.
Areas of expertise : Fabrication & Erection of Steel Structure
Zone : Ore & Flux, RMHS, Base mix, Coal yard
Period : ` (from March 2013 to November 2014)
M/S. REC Engineering Works & Services :
As a Site In-Charge
Project : 2 X 35 MW CFBC based Cogeneration Power Project, ITC ltd, Bhadrachalam, Telangana
Client : Enmas GB Power Systems Projects Limited.
Consultancy : ITC limited - paperboards & Specialty Papers Division (ITC PSPD)
Areas of expertise : Erection of Structural Steel of Thermal Power Plant 36 mw Boiler,
Zone : Boiler, Esp., Galleries
Period : (from June 2012 to February 2013)
M/s.
Durha Construction Private Limited :
(Formerly name changed as Zillion Infraprojects Private Limited.)
As a Sr. Engineer :
Project 350 X3 MW Power Project, Indian Oil Corporation Ltd, Paradip, Odessa
Client : Bharat Heavy Electricals Ltd (BHEL)
Consultancy : Engineers India Ltd (EIL)
Areas of expertise : erection & Alignment of steel structure
Zone : Boiler, Esp.
Period : (from November 2011 to June 2012)
M/s. Durha Construction Private Limited :
(Formerly name changed as Zillion Infraprojects Private Limited.)
As an Engineer :
Project : 1 X 330 TPH Power Project, RINL-Vizag Steel, Andhra Pradesh.
Client : Bharat Heavy Electricals Ltd (BHEL)
Consultancy : MN Dastur & Company (P) Ltd.,
Areas of expertise : Structural Erection
Zone : Electrostatic Precipitator (ESP)
Period : (from March 2010 to November 2011)
M/s. Six Sigma Engineering Works :
As a Engineer
Project : Pre Engineering Building
Client : Military Engineering Services
Consultancy : Military Engineering Services
Zone : Erection of structural steel building, Installation of Equipment
Period : (from November 2006 to February 2010)
M/s. National Authority of Fire fighting System (NAFFCO) :
As a Asst. Engineer
Project : Palm Jumeirah Pipeline Project, Dubai, U.A.E
Client : Palm Islands
Consultancy : Nikhil Properties
Areas of expertise : Erection of Pipeline (fire line)
Zone : Jumeirah Phase-1
Period : (from September 2004 to September 2006)
** Ensuring that all site activities are performed in an environmentally safe and responsible manner in accordance with HSE and follow-up all safety procedures, permit to work, etc.
** Checking civil foundations elevation before steel (columns / frames Erection).
** Supervising ground assembly for main columns with beams to compose frames can be lifted and erected one time.
** Supervising erection of main steel girders and bracings between frames (with consideration of erection sequence of small beams, bracings, angles, C-Channels and other medium & light steel items).
** Supervising alignment and bolt tightening for main members of the structure on the main Aligns and Axis before offering for inspection.
** Receipt of the design drawings from the consultant/client and issuing to site supervisors.
** Planning for fabrication and erection of structural steel work.
** Checking and processing of site mobilization.
** Planning for equipment required for erection of heavy structures.
** Preparation of Bill of Materials and arranging for checking by the consultant/client.
** Daily meetings with clients, Contractors & supervisors
** Solving site problems
** Coordination with contractor client and company management.
** Project Planning and Controls, Project management and project execution.
** Handling of material, monitoring and controlling of site.
** Day to day planning and scheduling of fabrication, erection work.
** Inspection of dimensional fit up report.
** Bill Certification with Client, R.A. Bill preparation
** Mobilization of Material and Manpower to Site.
** Work Schedule Preparation for Supervisors.
** Daily Progress preparation and Monitoring
** MTO Query and Billing Study of Isometrics and P&ID drawings
** Shop floor fabrication of carbon steel, alloy steel
** Checkup fit up, dimensions, orientations as per ISO
** Erection of service pipe racks / pipe supports/ pipe lines.
** Mechanical Box up of Valves and instruments. Loop clearance of pipelines.
** Supporting and alignment checking of pipe lines and instruments.
** Material reconciliation.
Personal Profile :
Name : Beesetty.Syamkumar
Father Name : B.V.Ramana
Date of Birth : 10th June 1978
Marital Status : Married
Language known : Telugu, Hindi & English
Nationality : INDIAN
Religion : Hindu
Education Qualification :
Diploma in Mechanical Engineering from Govt. Polytechnic College, Visakhapatnam (A field to State Board of Technical Education & Training, Andhra Pradesh), with an Aggregate of 62.9% in 1998.
Computer Credentials :
** Proficient with basic computer knowledge which includes MS Office, MS Excel, MS Word, Auto-Cad & Internet.
** CODES & STANDARDS & DRAWINGS FAMILIAR WITH
** ASME, ANSI, AWS, API, ASTM
** G.A.D, ISO, PLANT LAYOUT, P&ID.
Declaration :
I hereby declare that the above mentioned information is correct up to my Knowledge and I Bare the responsibility for the correctness of the above mentioned Particulars.
Place :
Date :