Pankaj Kumar Dubey
Email-pankajkumardubey77 AT gmail.com
Applied Post for Sr. Quantity Surveyor :
I am currently looking for opportunity in the field of Sr.Quantity surveyor,available for immediate joinging .I successfully complete Diploma in Cad & Quantity Surveying .I Have more than 6 years expeirience in the Highway project .
I Have good experience of Qty.calculation in Earthwork , DLC,PQC, Structure and other work,good knowledge of Structure and Highway Drawing.
Professional Experience :
1.Apco Infratech.Pvt Ltd.
Position-.Sr.Qs Sep-2018 to Till Date
Project : Development of Purvanchal Expressway (Package-III) from Jaraikala (Distt. Amethi) to Sidhi Ganeshpur (Distt. Sultanpur) (Km 79+900 to Km 121+600) in the State of Uttar
Client : UPEIDA
Consultant : EGIS India
Project Value : 1380.74
Responsibility :
** Making Monthly Bills Subcontractor Bills like of Earth work,Structure, drain, Kerb and other work.
** Preparation measurement of all highway and structural items.
** Preparation of Balance work Program, Monthly work program as per site condition.
** Reconciliation of material like a GSB, Aggregate and other material as per site consumption with physical stock.
** Preparation of As Built Plan/Cross-Section & Structure Drawings.
** Making of level sheet, Greed sheet as per P&P FRL for proper site execution.
** To interact with the Project Manager & Project Engineers to ascertain that certifications as per drawing / proper execution as per plan.
** Good Knowledge of Drawing and Cross Section Preparation Software like AutoCAD & 3ds Max.
** Matching profile of Structures and Highway.
** Preparation As built drawing of Structure.
** Preparation of Grid sheet Level Sheet of Highway.
** Preparation of Structure working drawings on the basis of contract drawings and site conditions.
2. Monte Carlo Ltd. March-2017 to Sep-2018
Position-Qs cum Cad Engineer.
Project : Widening to 4-lane with paved shoulder with CC pavement from km 256/550 to km 289/500 on Kota-Darah Section of NH-12 (Kota-Jhalawar Road) in the State of Rajasthan on EPC Mode.
Client : MINISTRY OF ROAD TRANSPORTATION AND HIGHWAYS (MORT&H).
Consultant : LNMIPPL IN ASSO. With PCPL
Project Value : 396.0 Cr.
Responsibility :
** Making Monthly Bills (Interim Payment Certificate), Subcontractor Bills.
** Making Monthly Progress Report (MPR) Submitted to Client.
** Preparation measurement of all highway and structural items.
** To work out preliminary quantities of all the items for all the packages based on preliminary design for the budgeting purposes.
** Preparation of As Built Plan/Cross-Section & Structure Drawings.
** To interact with the Project Manager & Project Engineers to ascertain that certifications as per drawing / proper execution as per plan.
** Deputy Project Manager in finalization of the final bills of the contractors.
** Good Knowledge of Drawing and Cross Section Preparation Software like AutoCAD & 3ds Max.
** Matching profile of Structures and Highway.
** Preparation of Structure working drawings on the basis of contract drawings and site conditions.
** Preparation of Control Chart, Bar Charts for Progress of work.
3.
Chetak Enterprises Ltd. Oct- 2015 to March-2017 :
Quantity Surveyor
Project : Rehabilitation and up-gradation of Neemuch-Manasa (SH-30) from Ch. 0.000 to Ch. 30.660 (Appx. Length 29.060 km) (Existing 4-lane in Manasa town Km 26/8 to 28/4(1600 m) not considered in project length) on SH-30 two lane with paved/hard shoulders Road project in the state of Madhya Pradesh”
Client : Madhya Pradesh Road Development Corporation.
Consultant : L N Malviya Infra Project Pvt. Ltd.
Project Value : 74.2 Cr.
Responsibility :
** Making Monthly Bills (Interim Payment Certificate) Subcontractor Bill.
** Preparation of Structure working drawings on the basis of contract drawings and site conditions.
** Preparation of RFI and Submission.
** Preparation of Design level, Plan, Layout Drawing and Cross-Section of MCW.
** Matching profile of Structures and Highway.
** Preparation of cross sections and evaluation of various quantities as per contract drawings and site conditions.
** Preparation of Control Chart, Bar Charts for Progress of work.
CHETAK ENTERPRISES LTD. Nov - 2012 to Oct - 2015 :
Assistant QS
Project : Four Laning of Chittorgarh to MP Border section Km 183+000 to 229+700 of NH 79 & Nimbahera to Pratapgarh Section Km 0+000 to 79+500 NH-113 State of Rajasthan.
Client : National Highway Authority of India
Consultant : CEG Consultancy.
Project Value : 564.5 Cr.
Responsibility :
** Making Monthly Bills (Interim Payment Certificate) and Sub-contractor.
** Preparation of Design level, Bus Lay Bay, Truck Lay Bay and Major/Minor Junctions.
** Preparation of Design level, Plan, Layout Drawing and Cross-Section.
** Preparation of Side Drain & Median Drain drawing.
** Matching profile of Structures and Highway.
** Preparation of working drawings on the basis of contract drawings and site conditions.
** Preparation of Control Chart, Bar Charts for Progress of work.
Educational Development :
** Graduate Diploma in Civil Engineering (G.D.C.E.) June. 2012.
** Passed class 12th from Govt. 2009 U.P. Board Allahabad.
** Passed class 10th from Govt.2007 U.P. Board Allahabad.
Computer Skills :
** Diploma in Auto Cad & 3ds Max.
** Road Estimator.
** Post Graduate Diploma in Computer Application.
** Microsoft Windows 98/XP, DOS, MS-Word, MS-Excel.
Personal Details :
Name : Pankaj Kumar Dubey.
Date of birth : 23/06/1992
Marital Status : Married
Nationality : Indian
Religion : Hindu
Languages Known : Hindi & English.
Certification :
I, the undersigned, certify that the above mentioned information is based on best of my knowledge and belief.
Date :
Place :