CAREER OBJECTIVE :
To work in a challenging job environment that utilizes my skills and abilities, and offers ample learning opportunities.
RESUME SUMMARY :
2 year Power Distribution Project experience
Inspection of Distribution Transformer Shifting Work
Inspection of 11 KV Lines ,Conductor Augmentation
Inspection of 33 KV Lines
Inspection of 33/11 KV Sub-Station
Inspection of 1200/600 KVAR Capacitor Installation Work.
Installation of Power Transformer, Additional Bay at Sub-Station
5 years experience of Comprehensive, Detailed & Preliminary Energy Audits handling
Conducting Workshop on Biomass & Co-Generation
2 years experience of Electrical Maintenance in a Fabrication Unit at Bhopal
EXPERIENCE SUMMARY :
Overall 9 yrs of Work experiences out of which 5 yrs in Energy Audit of different Industries, 2 yrs in Electrical maintenance & 2 year in Electrical Projects.
TECHNICAL SKILL SET :
Power Distribution : Distribution Transformer Shifting, Erection of 11, 33 KV Lines, Capacitor Installation, Conductor Augmentation, Additional Bay at Sub-Station
Energy Audits : Comprehensive, Detailed & Preliminary Energy Audits of various Industries.
Electrical Maintenance : D.G.Sets, Cooling Tower, Air Compressors, Transformers, Etc.
PROJECTS :
1. Power supply Installation of Railway Traction.
2. Gasifier Performance Testing & Evaluation
3. Detalied Energy Audits of Hindustan Copper Limited (Khetri, Rajasthan)
SGS India Pvt Ltd Electrical Safety Audits & DPR Prepared
1. Conducted 30 Electrical Safety Audits of Retail Outlets Of HPCL.
2. Detailed Project Report (DPR) Preparation of Gasifier System (2 MW).In Haryana State For Chanderpur Works Yamuna agar Haryana
3. Experience as a Quality Control Engineer (Electrical) in Rs 3500 Million Sugar Project (Gularia Chinni Mill) a Unit of Balrampur Chinni Mill of Capacity 8000-12000 TCD. & Two 10 MW & 21.3 MW Turbines. Responsible mainly for Erection ,Testing And Commissioning of Various Electrical Equipments installed in the Plant including Cane Yard , Mill House ,Boiling House ,Power Plant ,Go-Down etc. Responsibility also included Final Bill Verification of all Electrical & instrumentation contractors & all installation jobs as per standards.
Switch Yard installation for selling Electricity to state Electricity Boards.
(21.3 MW).Our Final Report includes all Recommendations for Quality improvement, required rectification and Areas of possible improvement.
I verify final commissioning of All the Motors, Transformers (Power) Control Panels, Switch Yard, Distribution Transformers, etc.
The Existing Plant have Two 10 MW & 21.3 MW Turbines .10 MW Capacity and are used for Plant Internal requirements & 21.3 MW for Selling Electricity to State Grid.
Detailed Energy Audits :
1 Surendra steel and rolling mills Malerkotla.
2 A.K. Alloys Pvt. Limited Malerkotla.
3 Semiconductor Laboratory limited (SCL) Mohali.
4 Legacy Foods Pvt Limited Baddi.(HP)
5 Hindustan Copper Limited Khetri Rajasthan.
6 Jai Industries (Mandi-Govindgarh , Punjab)
7 Jai Gases (Mandi Govindgarh, Punjab)
8 Punjab Milk Co-Op Pvt.Ltd (Patiala,Punjab)
9 RBI Building Chandigarh
10 Swaraj Automotives Pvt Ltd.
11 Appolo Fibers Pvt.Ltd (Ahmadgarh,Punjab)
12 Shrayans Industries Ltd.Ahmadgarh
13 DSM.Industries Pvt Ltd.(Nawanshahar Punjab)
14 Bhandari Hosiery Exports Ltd.(Lalru,Chandigarh)
15 Bhandari Exports Pvt.Ltd. (Ludhiana,Punjab)
16 A.B.Sugars Pvt.Ltd.(Hoshiarpur Punjab)
Preliminary Energy Audits Conducted :
1 10 Nos of Rolling Mills in Association with Enercon Solutions Pvt.Ltd (Mandi -Gobindgarh,Punjab)
2 5 Nos of LIC Building In different Regions Of Haryana And Punjab Conducted Business Meet on Biomass & CO-Generation Sponsored by ERADA and CO-sponsored By NITCON Chandigarh
Kumaran Industries Bhopal Electrical Maintenance Engineer
RESPONSIBILITIES :
Installation and Maintenance of Transformer, Cables, Over head lines, Colony wiring etc.
Reason of Leaving; To foster my Knowledge in a large set up and to gain experience in managerial work exposure.
EDUCATIONAL DETAILS :
D.A.V.V. Indore M.Tech.(Energy Management)
R.G.P.V. Bhopal B.E. (Electrical Engg.)
Certified Energy Auditor from Bureau of Energy Efficiency (BEE)
DECLARATION :
I hereby confirm that the information furnished above is correct to the best of my knowledge.
DATE :
PLACE :