Summary of Skills: Instrumentation Engineer with 4-years experience in Process Industry. Able to work on own initiative and as part of a team. Excellent analytical and highly logical skills. Dedicated to maintain high quality standards. Enthusiastic to learn.
Professional Career: Presently working as an Sr Officer – Instrumentation looking after projects and maintenance at Asian paints limited | 50-55 | IDA Layout | Phase II | Patancheru | Medak – 502 319, ISO 900I-2009 COMPANY since January 2011.
Educational Qualifications:
Examination Board/University Year Of Passing Percentage
B.Tech (Electronics and Instrumentation) Velagapudi Ramakrishna Siddhartha Engg college, Affiliated to ANU,Vijayawada 2007 83%
Intermediate Sri Chaitanya Junior College Guntur. 2003 94.2%
SSC St.Lukes Public School, Guntur. 2001 87.2%
Professional Working Experience:
** Job Responsibilities include:
** Knowledge of Process & Field Instrumentation.
** Exposure to Real time Control System, DCS of SIEMENS of model PCS7, also includes MODICON SCHNIEDER PLC..
** Exposure to Real time Control System, DCS of TATA-HONEYWELL of model TDC3000, also includes PLC of Model LM620- 35.
** Experience of Programming of various PLC's.
** Maintenance & Calibration of Field Instruments includes Electronic, Pneumatic, Hydraulic and also Smart Type Instruments with their Communicators.
** Experience of working with Controllers (PID, Cascade & 3-Element)..
** Maintenance and trouble shooting of vertical duplex air compressors
** 12MW power plant maintenance.
** Working areas includes Boilers, Integrated New clo2 plant and Sheeting machine.
** Developing Preventive maintenance schedule in working areas.
** Project Follow-up.
IT Skill Set:
C language, C++. Data Structures.
Projects Involved:
JAN2010-COMPLETED Boiler Automation Project, &n
bsp; BILT
** I am currently involved independently in developing the project.
** Good Knowledge of Process & control applications.
** Selection of Distributed Control System.
** Developing I/O Points, Control Loops & Process Interlocks.
** Finally DCS of ABB Make AC800M Controller is selected .
** All the control loops,process interlocks and I/O points are taken into line from the DCS .
** Whether all the instruments and motors are working from the DCS has checked .
** Entire Errection and Commisioning of DCS for power boilers is completed.
March 2009-Completed Producer Gas Plant (PGP) Project, BILT
** Erection & Commissioning of Producer Gas Plant.
** Good Knowledge of P & I Diagrams of PGP.
** Installation of Field Instruments.
** Cable Scheduling & Loop checking.
** PG Plant is Controlled & Operated by PLC of ABB Make.
June 2010 –Completed Oxygen and Nitrogen plant Modification, BILT
** Previously oxygen and nitrogen plant present in New Clo2 complex at BGPPL kamalapuram running by using cam motor timer mechanism now that cam motor timer mechanism is replaced by simple Siemens LOGO PLC of series 230 RC (6ED1 052-1FB00-0BA6) with an extension module used for increasing I/O capacity of plant of series DM 230RC (6ED1 055-1FB00-0BA1).
OCT2006-MAR2007: Automatic Car Parking, Velagapudi Ramakrishna Siddhartha Engineering College
** Car parking on a circular disk automatically.
** Micro-Controllers, Stepper Motor’s and belt Conveying System is used for parking the car.
** C-Language is used as Programming Language.
** Excellent Experience of application of Micro-Controllers & Stepper Motors.
** Interested to Upgrade the Project by using Smart Card System for Parking & Retrieval of the Car, and to extend the Parking System with multiple Disks .i.e., Multiple floors to park.
Academic Review:
Velagapudi Ramakrishna Siddartha Engineering College, (Vijayawada)
Affiliated to Acharya Nagarjuna University
Passed with distinction [83%] 2007
DECLARATION:
I, G Mani Kumar, hereby declare that all the details and particulars furnisher above are correct to my knowledge.