Mobile battery connector.
45 days
5 stage Progressive press tool Manufacturing.
Car window lever connector.
30 days.
Design and Manufacturing of compond tool.
Motor Supporter.
40 days.
Design and machining of Progressive press tool.
Chowk Switch.
30 days.
8 Cavity injuction mould Manufacturing of 2 Wheeler Chowk
Switch.
Agriculture lader step.
30 days.
Injuction mouldDesign and Manufacturing of agriculture
lader step.
GASCO.
8 Months.
GAD Extraction, Modeling in SP3D software, GAD generating
in Auto CAD.
Single sheet gas stove.
4 Months.
Design and development of single sheet gas stove, No
screws and weld joints visible from any side view of product,
Slimmer than existing products.
Got patent for this (Patent
No: C.B.R No. 10744).
Rack Ram.
30 days.
Reverse engineering, Modeling, Prototype, Injection mould
die Design. Die Manufacturing (Out sourcing)
Door lock lever cover.
30 days.
Reverse engineering, Modeling, Prototype, Injection mould