Welcome Guest

Site / Construction >> Site Engineer / Manager / Incharge / Supervisor 
Site Engineer Resume Sample, Experience : 8 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Site Engineer
Job related skills / software:HVAC, Fabrication Monitoring, Installation
Category:Site / Construction
Sub Category:Site Engineer / Manager / Incharge / Supervisor
Years of Experience:8 years
State:West Bengal
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:I.T.I. / ITI : Industrial training institute
Major / Specialization:Vocational Trade
Email Id:[Private]
 
Are you looking for job now?:No
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

JOB OBJECTIVE :
To constantly be a learning individual and apply the same for the benefit of the organization I work for, therefore
contributing towards its success and achieve personnel satisfaction.
EDUCATIONAL QUALIFICATION :
**S.S.C. [ West Bengal Board of Secondary Education. (W.B.) passed in the year 1996 ]
**Diploma Course [ Climate Control Technical Institute. (W.B.) passed in the year 1997 ]
**I.T.I. [ National Council for Training in Vocational Trades.(Bihar) passed in the year 2000 ]
Professional Experience:More than 8 years.
EXPERIENCE SUMMARY :
1.Currently working with ‘M/s Sterling & Wilson Ltd.’ (Mumbai) as a HVAC site engineer.
**Duration of association:1st March 2010 to till date
**Designation:Site Engineer
**Project:
**Site ‘Nipro India Project’ a project of ‘Shimizu Corporation.’ recently running at Shirwal (Pune), with installation of full HVAC systems & utility systems.
Responsibilities :
**Preparation & submission of daily reports of achieved & progress works.
**Supervision of daily project activities with intent of quality assurance and progress monitoring.
**Preparation & submission of reconciliation statement.
**Capable to lead the team of workmen & check their activities.
**Preparation & submission of work schedule which is to be done..
**Sort out problems on the site with engineers, architects & authority.
**Saves all records of achieved works with date by date.
**Takes the joint measurement of used materials with client.
**Informs to billing department to generate bills of achieved works.
**Maintains & performs the co-ordination with client, consultant, contractors & sub-contractors.
**Follows & asks to follow the safety rules to all our team mates.
**Keeps an eye on stock materials, Are these less in quantity for future use**
2.Worked with ‘M/s COOLAIR SYSTEMS’ (Mumbai) as a site supervisor.
**Duration of association:September 2002 to 12th December 2009.
**Designation:Site Supervisor / Technician
**Projects:as under
**Site ‘pfizer ltd’ a project of‘Lamfa projects’ recently completed at Jogeshwari (W) with installation of 30 nos. of three phase ductable units (cap. 8.3 TR, 4.6 TR & 6.4TR), 35 nos. of single phase Hi-wall units (cap. 1.5 TR & 2.0 TR) in Jan 2011.
**Site ‘Imperial tower’ (two 60 storied buildings) a project of‘Shapoorji Pallonji co.


ltd.’ completed at Tardeo with installation of 146 nos. of three phase ductable units (cap. 4.2 TR each),837 nos. of single phase Hi-wall units (cap. 1.5 TR, 2.0 TR & 2.2 TR), 294 nos. of inline & axial fans for fresh air & exhaust systems & 22 nos. of air washer units (Scrubber) for kitchen exhaust systems, in Aug 2010. (Running from Feb 2007)
**Site ‘DNA’ completed at Lower parel (W) with installation of 20 nos. of three phase ductable units (cap. 5.0 Tr & 8.0 Tr,) with round ductin, & site ‘Gaurav Jain’ completed at Pedder Road, with installation of 02 nos. of three phase VRV Systems, (cap. 6.0 HP each) with hard copper tubing, in 2006.
**Site ‘M. K. Jwellers’ completed at SEEPZ, Andheri (E) with installation of 02 nos. of three phase VRV Systems, (cap. 10.0 HP each), & site ‘Suruchi Chemicals’ completed at Santacruz (W) with installation of 01 no. of three phase VRV Systems, (cap.10.0 HP), with hard copper tubing, in 2005.
**Site ‘Ipca Laboratories’ completed at Kandivli (W) with installation of 03 nos. of three phase ductable units (cap. 10.0 TR each) with hard copper tubing, & site ‘BPL Office’ completed at Malad (W) with installation of 36 nos. of single phase Hi - wall units (cap. 1.5 TR & 2.0 TR), in 2004.
3.Worked with ‘ M/s Fair engineering’ (Mumbai) as a HVAC Technician from November 2001 to August 2002.
Nature of work :
Having knowledge of
**Installation, troubleshooting, repairing & maintenance of single & three phase window, split, ductable, slimline, cassette & other HVAC units.
**Installation, troubleshooting & maintenance of VRV systems.
**Operation & maintenance of packaged units.
**Operation & maintenance of chiller plant.
**Monitoring in fabrication, installation, & insulation of DUCTIN works.
4.Worked with ‘M/s Enviro controls engineers’ (Mumbai) as a HVAC Technician from November 2000 to October
2001.
Nature of work :
Having knowledge of
**Installation, troubleshooting, repairing & maintenance of single & three phase window, split, ductable, slimline, cassette & other HVAC units.
**Operation & maintenance of packaged units.
**Monitoring in fabrication, installation, & insulation of DUCTIN works.
Safety award :
Found safety award for best staff on good performance & activity from ‘ Shapoorji Pallonji co. ltd.’ on 13/08/08.
Other skills :
Having knowledge ofmechanical & electrical activities, & also have the knowledge of basic computer( word, excel & power point )

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.