Name of the Post Applied:Project Planning Engineer
Job related skills / software:Project Planning & Execution, Entailing Operations and Erection & Commissioning, P & ID Piping GAD, Isometric Sketches, Primavera.
Category:Site / Construction
Sub Category:Planning Engineer / Manager
Years of Experience:6 years
State:Bihar
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.Tech. : Bachelor of Technology
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:No
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

JOB OBJECTIVE :
Seeking assignments in Site Coordination, Planning and Execution, Project Management with an organization of repute in Construction/ Engineering, Energy / Power, Oil & Gas and all EPC companies

PROFILE SUMMARY :
A performance driven professional with 6 years of experience in Project Planning & Execution, Entailing Operations and Erection & Commissioning
Currently associated with Indian Oil Tanking Engineering Projects Ltd. (IOTEP), Barh, Patna as Junior Manager
Holds the distinction of executing numerous prestigious projects of large magnitude within a strict time schedule, cost and quality control
Proficient in handling fabrication operations, carrying out tests / inspection for various processes and checking quality standards
Adept in engineering drawings such as P & ID Piping GAD, Isometric Sketches, etc.
Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in co-ordination with contractors

ORGANIZATIONAL EXPERIENCE :
Junior Manager with Indian Oil Tanking Engineering Projects Ltd.] ), Barh, Patna, Bihar
Title : National Thermal Power Corporation (NTPC) 3X660 MW Super Thermal Power Project, Barh, Patna Bihar
Period : August’ 20011-Present
Client : JSC Techno Promo Export, Russia
Scope :
Barh STPP turns severe once put in single reheat boiler with balanced draft operations as designed by Techno Prome Exporters, Russia
The project involves preassembly, erection, alignment, testing and commissioning of boiler steel structure, pressure parts, piping, air pre heaters, rotary parts & ducting for 3 units of 660 MW thermal power plant.

Role :
Analyzed & interpreted drawings, detected errors and clarified the same with the designers
Carried out technical discussions and updated clients with the project’s proceedings
Provided technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements
Efficiently planned the resource requirements as well as prepared L3 schedule for the project
Allocated targets to various departments and effectively maintained bar charts on yearly, monthly as well as daily basis
Fabricated project reports and evaluated it’s progress in accordance with the targets
Successfully coordinated preassembly and erection of boiler pressure parts and steel structures
Effectively prepared Minutes Of Meeting, punch list, dimensional check reports and protocols during reassembly and erection
Formulated the erection schemes in detail, work procedures as well as method statements
Supervised activities associated with contractors/sub-contractors & ensured delivery of right resources at the right time
Maintained and updated technical documents as well as bills of the subcontractors

Highlights :
Successfully completed the first stage of drainable hydraulic test on scheduled time
Prepared preassembly & erection schedule for 2 units of 660 MW thermal power plant pressure part.
Prepared more precise progress reports for individual department head, based on the daily progress report. This was very help full to them to track progress in line with the plan and schedule, also to take corrective actions.
Provided technical suggestions to reduce the time and cost

Example :
reheater stage-2 coils consists of 256 individual coils hence 256 lift and 2000 welding joints at an elevation of 98.5 meters I suggested to make it blocks of 32 coils in each block by welding the inlet end of the coils to its common headers, by doing this 256 no of lifts was reduced to 8 no’s and 1000 welding joints are completed at the ground level. A special lifting arrangement was prepared for these with the help of design department.
Significantly involved in preparing the erection scheme for pressure parts by employing winches and rearranging the sequence accordingly, instead of EOT crane as proposed by the client
Efficiently prepared and presented a 3D model of the boiler on AutoCAD during Central Power Ministers site visit which was appreciated by the clients
Prepared a PowerPoint presentation visualizing the water steam flow of boiler with all connection details
Prepared a block drawing showing all major equipment inside the pent house with details of no of lift, unit weight, and position. The daily progress was directly highlighted on it. This was very simple and helpful to understand the daily progress to everyone.

Site in Charge, With Jaas Industrial Engineering Pvt. Ltd. (C/o Petron Engineering Construction Ltd.) :
Title : 3 x 660 MW Thermal Power Plant, APML, Phase-2
Period : May’2009 – Jul’11
Client : Adani Power Maharashtra
Analyzed and comprehended the drawings as well as assessed the scope of the project
Estimated material requirements and ensured operations are carried out as per the drawings
Supervised, monitored and coordinated a team of 250 labors including IBR, riggers and technicians and managed day to day operations of the site
Carried out preassembly, erection and alignment operations of equipments as per the protocol
Efficiently forecasted and resolved technical difficulties & related issues as and when they arise
Inspected preassembly and erection sequence of the pressure parts
Organized and planned work procedures and method statements
Formulated quality and dimensional check reports of various equipments
Identified material specification, inspection requirements and organizes for stage inspection as required
Executed activities pertaining to Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping /equipment.
Effectively coordinated with the inspectors for timely conclusion of functions as well as prepared and submitted project bills
Managed and maintained inventory, quality control, health and safety matters on site

Highlights :
Successfully completed the drainable & nondrainable hydraulic test of unit-3 with minor leakage.
Clarified lot of material related issues by comparing the BOQ in drawing, Packing list and the Actual requirement
Reduce additional cost and wastage of time by minimizing reworks by providing correct instructions and information’s to the technicians in proper time and giving additional attention to critical jobs.
After box up providing approach for welding lower panels inside the furnace was very difficult for that I have designed a new temporary arrangement using angles and channels, which was directly attached to panel at the ground level before lifting.


This arrangement was very economical, safer, and easily detachable.
A lot of nonproductive man power and working hours was saved by finishing maximum attachment works at the ground level before lifting there by reducing the risk factor of height work, more quality works at ground level, les cost, les time consuming

Mechanical Engineer with National Engineering Works :
Period : Nov’07 – Apr’09
Client : Cochin Shipyard Ltd.
Unit Fabrication
Fabrication and Erection of Indigenous Aircraft Carrier, Anchor Handling Tug & TEBMA 78.
Unit fabrication of Flap gate for Dock No.1
Refitting works on various ships
SBM Buoy, Tanker, Diving Vessel, Fishing Vessel, Dredging Ship, Passenger Ships & Navy Ships

Role :
Prepared different types of work permits for the mechanical activities (height work, hot work, confined space work etc.)
Attended the Permit To Work training classes, identified and controlled the hazards, visited sites with client, preparation for site audit, etc.
Organized work permits as well as fabrication drawings for the department
Prepared and monitored production schedules and inspected the erection of steel hull units
Effectively supervised steel fabrication units including plate marking, cutting, rolling, installation and welding works as well as introduced workers with the fabrication sequence and cleared the technical queries
fabrication of pipe spool, installation of piping, preparation of as built drawing and test pack, preparation of mechanical punch list, hydro testing, pre commissioning and commissioning activities of piping systems completed include flange joint leak test, air flushing, water flushing, nitrogen purging, etc.
Managed the manpower to achieve the targets

Handled the following on hull and outfit appendages :
Destructive Testing (Hose Test, Air Pressure Test and Hydrostatic Test)
Non-destructive Testing (Penetration Test, Magnetic Particle Test, Ultrasonic Test and Radiography Test)
Successfully implemented Integrated Management System (IMS) in all areas

Highlights :
Handled all types of mechanical fabrication and erection job in a ship building unit example :-Hull unit fabrication, pipe fabrication, electrical cable tray works etc.
Successfully completed the fabrication of 2 hull units of flap gate for the dry dock within 20 days weighing 35 MT in an emergency situation.

Faculty (Mechanical CAD) Cochin CADD Center, Palarivattom :
Period : Jun’07-Sep’07
Role :
Software instructor of AUTOCADD, CATIA V5, MSC NASTRAN
Project supervisor in AutoCAD

EDUCATION :
Bachelor of Technology in Mechanical Engineering from Department of Mechanical Engineering, Cochin University of Science and Technology (CUSAT) in 2007, 65%

IT SKILLS :
Drafting & Modeling : AutoCAD, CATIA V5, SolidWorks
Analysis : MSC NASTRAN
Planning & Scheduling : Primavera P6 & MS Project
Documentation : MS Office

CERTIFICATION :
Acquired ASNT-SNT-TC-1A Level II Certificate in RT, UT, MPT & PT

PERSONAL DETAILS :
Date of Birth : 4th April, 1986
Permanent Address : 'Harisree’ Kallipadam (Post), Shornur-2, Palakkad, Kerala-679122
Languages Known : Malayalam, English, Hindi and Tamil

DECLARATION :
I, Hareesh V S., hereby affirm that all the details above furnished are true to my knowledge and belief and can be supported by necessary documents.

DATE :
PLACE :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.