CAREER OBJECTIVE :
I BELIEVE THAT MY CAPACITY OF PROFESSIONAL GROWTH ALONG WITH MY DRIVE AND ENTHUSIASM MAKES ME AN EXCELLENT CANDIDATE FOR EMPLOYMENT IN YOUR ORGANIZATION, A COMPANY WITH WHICH I WOULD BE PROUD TO BE ASSOCIATED.
ACADEMIC QUALIFICATION :
** DIPLOMA IN ELECTRICAL ENGINEERING WEST BENGAL STATE COUNCIL OF TECHNICAL EDUCATION 2009-2012
SEM - I 73.6 %
SEM - II 69.3 %
SEM - III 77 %
SEM - IV 78.3 %
SEM - V 76.5 %
SEM - VI 81 %
AVERAGE 76.89 %
** DITA WEST BENGAL YUVA COMPUTER CENTRE. 2007 89%
** HIGHER SECONDARY (PURE SCIENCE) WEST BENGAL COUNCIL OF HIGHER SECONDARY EDUCATION 2006 59.3 %
** SECONDARY WEST BENGAL BOARD OF SECONDARY EDUCATION 2004 69 %
INDUSTRIAL TRAINING :
1 MONTH INDUSTRIAL TRAINING ASSOCIATED WITH VARIOUS OPERATIONS AND MAINTENANCE DEPT. AT ELECTROSTEEL CASTINGS LTD, HALDIA.
PRESENTLY WORKING AT :
TUAMAN ENGINEERING LIMITED (SISTER CONCERN OF HIMADRI CHEMICALS & INDUSTRIES LIMITED) – AN ISO 9001 : 2008 CERTIFIED EPC COMPANY.
DURATION : 12’TH OCTOBER, 2016 TO TILL DATE
POST HELD : SITE ENGINEER-ELECTRICAL
DEPARTMENT : ELECTRICAL PROJECT
PROJECT INVOLVEMENT : RAILWAY ELECTRIFICATION PROJECT(FROM BHIGWAN TO GULBARGA) UNDER TUAMAN ENGINEERING LIMITED.
CLIENT NAME : ISOLUX
DURATION : 15 DAYS
JOB RESPONSIBILITY : SITE VISIT FOR STARTING OF RAILWAY ELECTRIFICATION PROJECT WITH RVNL.
PROJECT INVOLVEMENT : RAILWAY ELECTRIFICATION PROJECT(FROM MALDA TO PAKUR) UNDER TUAMAN ENGINEERING LIMITED.
CLIENT NAME : AMR INDIA LTD
DURATION : 4 MONTH
JOB RESPONSIBILITY :
** OHE FOUNDATION LOCATION MARKING RESPECTIVE TO LOP.
** EXECUTION FOR CASTING OF VARIOUS TYPES OF OHE FOUNDATIONS
** VARIOUS TYPE OF MASTS ERECTION BY USING BFR MANAGING WITH BLOCK.
PROJECT INVOLVEMENT :
ERECTION, TESTING & COMMISSIONING CONSTRUCTION POWER SUB-STATION(11/0.415KV) AT DIFFERENT LOCATIONS OF
COKE OVEN BATTERY NO. # 05 PROJECT IN RASTRIYA ISPAT NIGAM LIMITED, VISAKHAPATNAM) MODIFICATION OF HVMCC & LT MCC PANEL & VARIOUS MISCELLANEOUS JOBS IN VISAKHAPATNAM STEEL PLANT,VISAKHAPATNAM.
JOB RESPONSIBILITY :
** PROJECT PLANNING, DRAWING CHECKING & RECTIFICATION, MATERIAL MANAGEMENT,
** DAILY PROJECT PROGRESS REPORT ETC.
** SIZE CALCULATION OF CABLE, CONDUCTOR, TRANSFORMER & BUS-BAR ETC.
** AUTO OPERATION OF PCC PANEL WITH INCOMER-1(TR. POWER),
** BUS COUPLER AND INCOMER-2(DG. POWER). DESIGNING, ERECTION, TESTING,
** COMMISSIONING OF DISTRIBUTION TYPE SUB-STATION (11/0.415KV)
** INCLUDING THE FIXING ARRANGEMENT OF OVERHEAD LINE(11KV)
** ACCESSORIES (ISOLATOR, LA, DO-FUSE, DISK/PIN INSULATOR, A
** CSR CONDUCTOR, AB CABLE ETC.)
** AT SINGLE POLE, DOUBLE POLE & FOUR POLES FOR THE TRANSMITTING OF POWER.
** TESTING, COMMISSIONING OF TRANSFORMER, PCC, DG, MCC, VFD, LDB, APFCR PANEL ETC.
** TESTING, COMMISSIONING OF DOL, R-DOL, Y/D, R-Y/D, LIGHTING FEEDER STARTER & HEATER PANEL STARTER ETC.
** TESTING, COMMISSIONING OF HIGH MAST TOWER ILLUMINATION, STREET LIGHT ILLUMINATION ETC
** CIVIL EXECUTION (PCC, RCC)
** FOR THE FOUNDATION OF TRANSFORMER, LTDB, VCB,
** HIGH MAST TOWER & RAIL POLE. ELECTRICAL DRAWING & DOCUMENTS & M/S WORD & EXCEL.
PREVIOUSLY WORKING DETAILS :
COMPANY NAME : STAR ELECTRIC & ENGINEERING.
DURATION : 1YEAR & 04MONTHS (MAY 2015 TO 11’TH OCTOBER 2016).
POSITION : SITE IN CHARGE.
PROJECT : WESTERN BITUMEN PROJECT LTD, SAMBALPUR, ORISHA.
INDOOR SUBSTATION VARIOUS RATING OF MOTOR TESTING & COMMISSIONING. 250 KVA DG ERECTIONS AND COMMITIONING.
PROJECT : RASTRIYA ISPAT NIGAM LIMITED, VISAKHAPATNAM, ANDHRA-PRADESH.
LIGHTING ILLUMINATION WORKS. MODIFICATION OF VARIOUS PANELS WITH COMMISSIONING.
MODIFICATION OF C.P.S.S AT 11KV SUBSTATION.
COMPANY NAME : ELECTROTECH DURATION: 3 YEARS (MAY 2012 TO MAY-2015)
POSITION : SITE IN CHARGE.
PROJECT : HINDUSTAN PETROLEUM CORPORATION LIMITED; HALDIA AUTOMATION SYSTEM.
PROJECT : THERMO SYSTEM PVT LTD PROJECT-CESC THERMAL POWER PROJECT (HEL SITE, HALDIA)
WORK PROFILE :
** INSTRUMENT (PT, LT, LS, LI, DPS, DPG) INSTALLATION & THEIR CONNECTION.
** CABLE LYING AND TERMINATION IN JB SIDE, PANEL SIDE & INSTRUMENT SIDE.
** IMPULSE LINE FITTING. ERACTION OF LCP, MLDB AND CVT PANEL AND CONNECTION.
** INDOOR AND OUTDOOR ILLUMINATION JOB.
PROJECT : ALSTOM T&D INDIA LTD – CESC THERMAL POWER 400KV SWITCH YARD PROJECT (HEL SITE, HALDIA)
WORK PROFILE : INDOOR AND OUTDOOR ILLUMINATION JOB AND AIR CONDITION SYSTEM.
PROJECT : PUNJ LOYD LTD – CESC THERMAL POWER PROJECT (HEL SITE, HALDIA)
WORK PROFILE : INDOOR AND OUTDOOR ILLUMINATION JOB AND AIR CONDITION SYSTEM.
PROJECT : DHUNSERI PETROCHEM AND TEA LTD, HALDIA
WORK PROFILE :
1. CABLE LAYING, JOINTING & DISMANTLING (THROUGH CABLE TRENCH) LT & HT UPTO 33KV.
2. AC/DC BOTH MOTOR WIRING, MAINTENANCE, INSTALLATION & CONNECTION ALL TYPE OF STARTER UP TO 660 VOLT, 250 KW.
3. INSTALLATION, COMMISSIONING & MAINTENANCE OF FIRE ALARMSYSTEM.
4. ERACTION EARTH PIT (ELECTRICAL AND INSTRUMENT).
5. INSTALLATION & CONNECTION OF ALL TYPE LIGHT UP TO 440 VOLTS.
6. INSTALLATION & CONNECTION OF EXHAUST FAN & MANCULAR FAN.
7. ERACTION & COMMISSIONING OF VFD PANEL.
8. ERACTION AND COMMISSIONING OF INSTRUMENT LIGHTNING ARRESTER AND ELECTRICAL ALSO.
9. INSTALLATION. COMMISSIONING AND MAINTENANCE OF PA SYSTEM.
PROJECT :
** BHARAT PETROLEUM CORPORATION LTD, HALDIA.
** ERACTION & TESTING OF EARTH PIT FOR FOHS TANK.
** LAYING OF MANY TYPES OF GI STRIP FOR GRID CONNECTION
PROJECT :
** HINDUSTAN PETROLEUM CORPORATION LIMITED.HALDIA.
** AUTOMATION SYSTEM.
PERSONAL ATTRIBUTES :
** HARD WORKING WITH PLANNING ABILITY.
** HIGHLY MOTIVATED AND SELF DRIVEN.
** FOCUSED AND ENTHUSIASTIC TO COMPLETE THE GIVEN ASSIGNMENTS.
PERSONAL PROFILE :
FATHER’S NAME : SUBHAS CHANDRA SAMANTA
PERMANENT ADDRESS : VILL – BASULIA P.O. – BASULIA P.S. – MAHISHADAL DIST. – PURBA- MEDINIPUR WEST BENGAL PIN - 721628
DATE OF BIRTH : 9TH JUNE 1988.
GENDER : MALE.
MARITAL STATUS : MARRIED.
NATIONALITY : INDIAN
RELIGION : HINDU.
LANGUAGE KNOWN : BENGALI, ENGLISH, HINDI.
INTERESTS : LISTENING MUSIC. SURFING INTERNET.TRAVELING
SALARY: CURRENT CTC 2.7 LACKS PER ANNUM WITH FOODING (6000/MONTH),LODGING,TRAVELLING,MOBILE EXPENSES.
EXPECTED CTC 5 LACKS PER ANNUM WITH FOODING,LODGING,TRAVELLING,MOBILE EXPENSES.
DECLARATION :
I HEREBY DECLARE THAT ALL THE INFORMATION FURNISHED ABOVE IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.
PLACE :VISAKHAPATNAM
DATE: 20.02.2018