CURRICULUM VITAE
PERSONAL DATA :-
NAME : GIRISH KUMAR GOVINDBHAI TANK
BIRTH DATE : 11th JULY, 1972
PERMANENT & : 19/B,Nutan Maheshwar Nagar Society, Near Vidhya Vihar
POSTAL ADDRESS School, Subhanpura, Baroda-390023, Gujarat- INDIA.
PHONE NO. & : +919712495793 / 9619877628 (M)
CONTACT NO. : +91-265-2280916(P.P.)
SUMMARY OF EXPERRIENCE :-
Total 19 years of experience in Oil & Gas Petroleum Refinery, Fertilizer, Petrochemical, chemical & Power Plant offsite Facilities, Utilities and offsite Utilities. includes preventative, predictive and breakdown maintenance in the areas of process Instrumentation associated with DCS/ESD systems, General Field instrumentation and test equipment. EPC Projects, Planning, Costing, Tendering, Estimation, Contracts, Engineering, Procurement, Vendor Development, Expediting, Installation & Commissioning. Responsibility including Responsible for all activities related to Instrumentation discipline. Review of Layout Drawings for Cable trays, Review of Instrument, Jobs etc., Review of Hook up Drawings Review of Cable Schedules etc., Review of the Instrument Index and Logic flow Chart. Day-to-Day site Supervision handled projects as per schedule, Planning Manpower Schedule.
System Platform worked :-
DCS like Honeywell TDC-2000 & TDC-3000, Yokogawa Micro XL & Centum CS, Fisher Rosemount RS3 & delta V, Foxboro & PLC Like Hima, Allen Bradley, Siemens, Omron, GE Func, Modicon, Waugh Control, triconex TMR etc.
In the logic side sequence checking for Boilers flare unit logic for Flare Start up, Air–Dryer Logics etc. Also done modification with wiring and Termination. With all this preparing the revised Loop drawing and Logic sequence drawing according the Done modification work. And finally approving with Engineering Section.
Worked totally in compressor & Steam Turbine area likeGE, Siemens, ABB, Nuevo-Pignon & Mitsubishi etc. with all this removing of all the Non-Contacting type Vibration Axial, Radial & Speed Probes with Thermocouple Element for checking and calibration of Probes with Bentley Nevada 7200, 3300 & 3500 Monitors. After mechanical clearances fixing back the probes with Gap-Voltage, also Thermocouple Elements and finally checking of all the logic for safe tripping of Steam Turbine Compressors.
EMPLOYMENT RECORD :-
Organization :- Tata Projects Ltd., Mumbai.
Period :- From May-2006 To Till Date.
My Responsibilities & role are as Follow
Review the Detail Engineering documents with respect to scope of work (SOW) and Bid document.
Review tender package and raise technical queries & the implication of the technical clarification.
Prepare / review system architecture drawing.
Carryout sizing of control valves.
Prepare/ review technical specification of all instrumentation items.
Review documents submitted by the vendors.
Identify the changes with respect to contracts and inform contracts Project Department of the changes and variations.
Review of documents prepared by Engineering Subcontractor to ensure quality & technical compliance to the project specifications and international standards.
Coordinates with Company & Engineering Subcontractor Instrumentation Lead Engineer to ensure project discipline requirements are met.
Coordinates with other TPL Engineering discipline Engineers to ensure project discipline requirements are met.
Resolve day to day matters pertaining to incomplete information or ambiguity in specifications / drawings for their respective disciplines.
Provide Field Engineering support for resolving any technical queries raised by the Site Project Management team.
Provide technical support to the TPL Procurement team and Business Development team.
Organization :- Detection Instrument (I) Pvt. Ltd., Bombay.
Period :- From March-2005 to April-2006.
Worked on various contracts in LNG Shell & GSPL Hazira, IOCL Baroda & Haldia, BPCL Assam Different Plant & Side For Fire & Gas Detection Automation Installation, Calibration, Loop Checking Functional Test Of Each Logic For Process Equipment. To Ensure Safety Interlocks In Ready Position Before Start Up Of Process Equipments. Hand over Procedure From sections By Sections To The Clients As Per Satisfaction.
Organization :- A-Z Instrument Services, Baroda.
Period :- From Aug-1997 To Feb-2005.
Presently I am working on their Various Contracts of EPC Projects, Planning, Costing, Tendering, Estimation, Pre-Bid Engineering, After Award of Contracts Engineering, Procurement, Vendor Development, Expediting, Installation, Pre Commissioning & Commissioning. Processing & Analyzing Bids / Projects With Surveys / Site Visits / Pre-Bid Meetings & Segregation of Scope of work for Electrical & Instrumentation Linked with Required Engineering Including Planning, Execution Plans, Manpower Histograms, Key Dates & Bar Charts, for Large Scale EPC Contractor on pattern of a Turnkey Execution with a team planners E & I Estimators & Compilers with front end Engineering Design as and where applicable in individual capacity, Joint Ventures, Tie-Ups & Consortiums Till The Installation & Commissioning of the Projects.
Worked on various contracts in IOCL Baroda. IFFCO Kalol. Daniel Flow Measurement & Control Baroda. Different Plant & Side for Terminal Automation & LNG, CNG Gas Metering Skied. Installation, Calibration, Loop Checking Functional Test of Each Logics For Process Equipment. To Ensure Safety Interlocks In Ready Position Before Start up Of Process Equipments. Hand over Procedure from sections By Sections to the Clients as per Satisfaction. Worked on various contracts in KRIFFCO Hazira, GSFC & IOCL Baroda, IFFCO Kalol & Kandala, ONGC & GAIL different Plant site for their Project & ARC Maintenance. Including entire job involved Calibration, Installation Loop checking, Pre Commissioning & Commissioning.
Organization :- SASAREF, SADAF, IBN-ZAHAR, SAMAD, SAFFCO,
Through Jal International, Saudi Arabia
Period :- From February-2003 to August-2003.
Worked at SABIC Group of Companies in the Maintenance Department & involved in Shutdown Maintenance Calibration, Testing, and Commissioning of Various types of Filed & Control Room Instruments. Worked at M/s SADAF in Ethylene Up Gradation project Through M/s TATA HONEYWELL Installation, Calibration Loop Checking Functional Test Of each Logics For Process Equipment’s To EnsureSafety Interlocks In Ready Position Before Start Up Of Process Equipment’s.
Organization :- Laffan Gas (Through Gulf House of Trade & Construction Company, Doha-Qatar)
Period :- From May-2002 to June-2002.
Worked at Ras Gas Train-I HGP Shutdown in Maintenance Department for Instrument Fire & Gas Detector & system. Performed Servicing, Calibration, Testing, Pre Commissioning & Commissioning of Fire & Gas Detector’s & System’s.
Organization :- Gujarat State Petro net Limited, Hazira. (Through Dress Rend India Private Limited.)
Period :- From Octomber-2001 to March-2002.
Worked at GSPL Gas Compressor Integration Project (O&M), Hazira under M/s Dress rend India Private Limited. Performed Servicing, Calibration, Testing, Pre Commissioning & Commissioning of Instrument. Daily Operation & Maintenance of Fisher Rosemount DCS (Delta -V) & Siemens PLC (S7) Systems
Organization :- Oman Refinery Company L.L.C., Ruwi (Through M/S Arabian Industries, Oman)
Period :- From March-2001 to April-2001.
Worked at Oman Refinery Co., L.L.C., Ruwi, 2001 T+I in the Maintenance of Level Troll Make Masoneilan & Control Valve of Various make such as Masoneilan, Worcester, Kitz, McCanna, Valtek, Sere / Kinetrol, Saunders, Nakakita, SMC etc.
Performed Overhauling, Servicing, Valve Bend setting, Seat Leak Testing, Body Hydro testing, Diaphragm Leak Testing & Finally Valve Stroke Checking with valve Positioner.
Organization :- Petrochemical Industrial Complex, (Through UB Engineering, Kuwait)
Period :- From September-2000 to Octember-2000.
Worked at PIC in the Shutdown Maintenance Calibration, Testing, Commissioning of Various types of Filed & Control Room Instruments. This includes preventative, predictive and Breakdown maintenance in the areas of process Instrumentation associated with DCS/ESD systems, General field instrumentation and test equipment.
Organization :- Qatar General Petroleum Company, Mesaieed. (Through Med Gulf Construction Company, Doha-Qatar)
Period :- From April-1999 to May-1999.
Worked at QGPC NGL-2 Plant, Mesaieed in the Maintenance of Control Valve of Various Make such as Masoneilan, Valtek. Performed Overhauling, Servicing, Valve Bend setting, Seat Leak Testing, Body Hydro testing, Diaphragm Leak Testing & Finally Valve Stroke Checking With valve Positioner
Organization :- FERTILE & M/s ADNOC, Ruwais (Through Euro Mechanical, Abu-Dhabi)
Period :- From Octomber-1998 to December-1998.
Worked at FERTILE & ADNOC, Ruwais in the Maintenance of Control Valve of Various Make such as Masoneilan, Valtek. Fisher Rosemount, Eckardt, Gadlius, Nuovo-Pignone, Yamatake Honeywell and ABB Kent Taylor Performed Overhauling, Servicing, Valve Bend Setting, Seat Leak Testing, Body Hydro testing, Diaphragm Leak Testing & Finally Valve Stroke Checking with valve Positioner.
Organization :- Kuwait National Petroleum Company , Mina Al Ahmadi Refinery (Through IMCO, Kuwait)
Period :- From October-1996 to July-1997.
Worked at KNPC, mina Al Ahmadi Refinery North/South Pier Restoration Project in Installation, Calibration, Loop Checking Functional Test Of each Logics For Process Equipment’s To Ensure Safety Interlocks In Ready Position Before Start Up Of Process Equipment’s. Pre- Commissioning & Commissioning of Smith Skeed Metering System and PLC of Waugh Control, DCS of ABB.
Organization :- Indu Nissan Oxo Chemical Industries Ltd., Baroda.
Period :- From September-1993 to September-1996
In the Maintenance Department carrying out daily Instrumentation activities associated With Petrochemical Plant offsite Facilities, Utilities and off plot Utilities. This includes preventative, predictive and breakdown maintenance in the areas of process Instrumentation associated with Microprocessor based control /ESD systems, General field Instrumentation and test equipment.
DUTIES AND RESPONSIBILITIES :-
Carry out Instrumentation PPM’s as directed, monitors and maintains the health of Instrumentation Associated within his assigned area of the Plant. Maintains Field instrumentation such as Process Analyzers, Transmitters, Vibration monitoring Equipment and metering systems.
Be able to recognize the cause of failure in equipment. Assists as required in the preparation of Instrumentation related Maintenance work Procedures Ensure accurate maintenance history is provided with all completed work so that all work orderscan be properly closed out.
Supports other disciplines in the trouble shooting and faults finding of equipment.Ensure Compliance at all times with the Company’s Environmental Health and Safety. Procedures. As well as occupational health and safety regulations similarly compliance with SecurityStudy and Understand the Documents like Loop Schematic, Hook up drawings, Bill of Materials, Cable Schedule, etc. which are related to the works. Check and Identify the Material required for Fabrication/Erection Ensure the materials are as per the requirements. Prepare work Schedule based on the Scope of work Follow up with Sub-contractor for manpower and Tools/Tackles mobilization Check the Work front availability at the work spot includes the availability of tapings, erection of valves, etc.
Explain the Work clearly to sub– Contractor / Skilled Technicians to start the work. Inform Sub contractor to start the work and supervise the work whether they are executing the works As per Standard drawings and documents Do Inspection for the works executed and rectify the faults immediately Pneumatic test for tubing / impulse piping works has to be carried out to ensure leakage in tubes/joints Loop checking for cables to be checked to ensure proper connection and proper working of instruments Pack the instruments properly to avoid transit damage Check the work front availability status. If work front is not available inform client release the fronts at the earliest Check the materials, instruments availability status as per the Bill of Materials If sufficient front is available to start the work, mobilize the manpower / contractor with all necessary tools/tackles Plan and prepare erection Schedule and inform contractor to mobilize the manpower and manpower and tools accordingly Ensure safety at Work Spot Obtain work permits before starting the works Get certification from client for the works executed Submit the monthly progressive bills to client timely and get the payment as early as possible Send Site Progress report to head office periodically.
TECHNICAL QUALIFICATION :-
Trade(Examination) Institution Duration Year of Passing % & (Class) From To
Instrument Mechanic Industrial Training Institute Palana, Nadiad, Gujarat. July-1991 July-1993 July-1993 70 % (Dist)
Diploma in Inst. & Control Jan Seva Foundation Trust National Education Management, Ahmadabad June-2007 June-2010 June-2010 70 % (Dist)
TECHNICAL TRAINING :-
Apprenticeship (NCTVT)
Company (Training Place) Duration Year of Passing % & (Class) From To
Instrument Mechanic Chem. Plant Indu Nissan Oxo Chemical Industries Ltd., Bajawa, Vadodara, Gujarat. Sep-93 SEP-96 November-96 70 % (Dist)
PROFESSIONAL TRAINING :-
Hi-Tech Training Scheme (An Indo-German Project) Employment & Training Department, State Govt.
No. Nature of Training From To
01 Programmable Logic Controls (PLC) 07/05/2001 19/05/2001
02 Pneumatic Controls 04/06/2001 08/06/2001
03 Electric Controls 11/06/2001 15/06/2001
04 Electropenumatic Controls 18/06/2001 22/06/2001
TRAINING ATTENDED :-
(1). Introduction to Health, Safety and Environment.
(2). Hydrogen Sulfide (H2S) Awareness and Escape.
(3). Permit to work holder course.
(4). Basic understanding of computer systems and knowledge of software such as Microsoft Office, MS Project & AUTOCAD.
(5). Days Training Program on Fisher Rosemount DCS (Delta -V) / Siemens PLC (S7) at GSPL Gas Compressor Plant, Hazira by Dresser Rand.
(6). 5 Days Training Program on Primavera P3 & P6 by KLG systel’s.
(7). 3 Days Training Program on New Manager Transition at Celebrity Resorts, Hyderabad.
(8). 5 Days Training Program on wonder ware SCADA / Allen-Bradley (Micro-logix-1000/1200/1500) PLC System at NPCIL, Kudankulam.
(9). 5 Days Training Program on DCS (Experion PKS Engineering) / PLC (Safety Manager) in JRD TATA Automation Training Center at Honeywell Automation India Limited, Pune.
(10). 5 Days Training Program on ERPmodule integrated with oracle Database related to Company Project.