PROFILE SUMMARY :
18 Years Experienced in embankment road and multistoried building and dormintories building and filed surveying works
Basic Qualification :
Diploma in Civil Engineering (First Class) April-95
EXPERIENCE DETAILS :
Employer : K.R.S Engineering Contractor No. 4, Deju Plaza, Srinagar Colony, saidapet, Chennai- 18
Designation : Site Engineer
Duration : April -95 to May 2000
RESPONSIBILITIES :
(i) Field setting out of all Embakment formation details
(ii) Field Excution with manpower and machineries
(iii) Maintaing relevant levels and quantity check test releated to embankments
(iv) Using Electronic the odite in checking alignement and curves
(v)Working out of quantities of materials of completed project & Preparation of bills
Employer : J.K Costruction, Peramathivallur – Namakkal
Name of Work : Sri Palani Murugan Spining Mill, Perundural (Industrial Building) (K.G.Group)
Duration : June 2000 to 2003 April
Designation : Site In Charge
RESPONSIBILITIES : (i) Programme of Scheduling
(ii)Allocation of Work
(iii) Arrangement of work and achieve the progamme of Schedule
(iv)Layout marking and reinforcement checking as per Drawing
(v)Checking for shuttering and concreting and quality control etc. completed.
(vi) Preparation of bills
EMPLOYER :
Yes-Yes-High Tech Promoters India Pvt.Ltd., Erode
Name of Work : Sri Kannan Department STORE, Nellambur, Coimbatore,
DURATION : June 2003 to October 2004
DESIGNATION : Project Engineer
RESPONSIBILITIES :
(i) Programme of Scheduling
(ii) Allocation of work
(iii)Arrangement of work and achive the programme of Schedule
(iv) Layour marking and reinforcement checking as per Drawing
(v) Checking fro shuttering and concreting and quality control etc., completed.
(iv)Preparation of bills
(vi) Working out of quantities of metrials and preparation of bill and completed project in stipulated period.
EMPLOYER : Yes-Yes – High Tech Promoters india PVT.Ltd., Erode.
NAME OF WORK : Sri. Lakshmi Narayana Meical College, Pondycherry.
DURATION : December 2004 October 2005
DESIGNATION : Project Engineer
RESPONSIBILITIES :
i) programme of scheduling
ii) allocation of work
iii) arrangement of work and achieve the program of schedule.
iv) layout for shuttering and reinforcement checking as per drawing.
v) checking for shuttering and concreting and quality control etc., completed.
vi) preparation of bill.
vii) Working out of qualities of material and preparation of bill and compelled project in stipulated period.
EMPLOYER : yes-yes-high tech promoters India Pvt .
Ltd.,
NAME OF WORK : best colour solution India PVT Ltd.,
DURATION : November 2005 to December 2006
DESIGNATION : project engineer
RESPONSIBILITIES :
i) programme of scheduling
ii) allocation of work
iii) arrangement of work and achieve the programme of schedule.
iv) layout marking and reinforcement checking as per drawing.
v) check for shuttering and concreting and quality control etc., completed.
vi) preparation of bill
vii) working out of qualities of material and preparation of bill and completed project in stipulated period.
EMPLOYER : A.S construction, Perundurai.
NAME OF WORK : MOULDING Shop (mould well products (20,000) SFT INDIA PVT Ltd., sarkar,samakulam,Coimbatore,
DURATION : December 2006 to 2007
DESIGNATION : project engineer
RESPONSIBILITIES :
i) programme of scheduling
ii) allocation of work
iii) arrangement of work and achieve the program of schedule.
iv) layout for shuttering and reinforcement checking as per drawing.
v) checking for shuttering and concreting and quality control etc., completed.
vi) preparation of bill.
vi) Working out of qualities of material and preparation of bill and compelled project in stipulated period.
DESIGNATION : Own construction sree murugan builders
DURATION : MOULD WELL PRODUCTS India Pvt . Ltd., October 2007 To June 2008 interior
Alteration work June 2008 to December 2008
NAME OF THE WORK : Total material contract residition building at sivagangai.2009 January to 2013 to dill date shop –mould well products india PVT Ltd., sarkar, samakulam, Coimbatore.
DATE :
PLACE :