TUHIN MIDYA
Email : tuhinmidya1991 AT gmail.com
Contact :7699379032/7878407855/
PROJECT PLANING & EXECUTION – MECHANICAL
Seeking assignments with growth-oriented organization in the domain of Projects across Oil & gas /Power Plant Any other industry.
PROFILE :
** Technically competent Diploma in Mechanical Engineer, with an experience of 5 years in Structural Fabrication , Erection, Equipment works.
** Currently associated with Gannon Dunkerley & Co.Ltd. As Structure Engineer.
** Effective resource planning/ optimization, focusing on waste reduction, enhancing productivity and profitability. Inbuilt ability to use sound judgment, decision-making skills & effectively perform in a self-directed environment.
** Exhibit skills in Project Management including project scheduling , and monitoring coupled with structured inputs for purchase & procurement, contracts management, materials management , site management, cost rationalization and continuous improvement.
** Focused and hard working with well-honed management skills and proven ability to motivate professionals to maximize levels of targets.
PROFESSIONAL EXPERIENCE :
GANNON DUNKERLEY & CO. LTD. December 2014- till date Site Engineer
KEY RESPONSIBILITIES :
** Carrying out day-to-day planning and scheduling of project activities to timely execute and give vertical start up for all project jobs in time to meet all requirements deadlines in the best possible way.
** Inspecting and certifying the supply materials which are received from the vender side, preparing layout estimation for all structural works.
** Preparing drawings (Civil,Mechanical,structural),presentations and database preparation, preparing weekly, monthly & three-month look-ahead schedule along with the man-hours calculation for projects.
** Monitoring progress and preparing detailed Schedule from Bill of Quantities, preparing expediting reports for sections of works which are behind schedule.
** The materials will be at appropriate location for easy identification. After inspection the supplied materials if any problem arise regarding the quality of the same the issue will be discussed and sorted out.
** Managing material allocation w.r.t. to available structural drawings, establishing front availability & material availability to the client as well as internally. Coordinating with QA/QC personnel and checking the progress.
** Eliminating Cost and time over runs in project execution due to uncertainties and to ensure completion of targets.
** Involved in re-conciliation of material issued for the project works.
** Verifying contactor bills like Fabrication, Erection, Alignment, and NDT clearance.
** Assisting in the preparation of standard operating procedures (SOP”s) for the maintenance of site equipment.
** Conducting periodic check potential areas for energy savings opportunities. Assisting the department in conducting regular systems audit.
** Based on progress report received from site, project schedule shall be updated monthly and report shall be made including milestone activities/ critical issues and distributed to concerned persons.
** Ensure Jobs were executed with safety and quality conscious.
** Resourceful at strategy zing techniques for maximum utilization of Manpower / Machinery.
** Receipt of material from storage yard, loading, local transportation unloading of Raw materials.
PROJECT DETAIL :
Project Title : Reliance Petrochemical Ltd. J3 Project Jamnagar Gujarat
Organization : GANNON DUNKERLEY & CO. LTD.
Duration :Dec.2014 – till date Role Junior Engineer
Responsibilities :
** Responsible for planning, monitoring and Erection of 5000 MT Structural jobs being carried out for C2 OSBL Unit.
** Publishing daily, weekly and monthly progress achieved against planned quantities.
** Coordinating weekly, monthly meetings with contractors and management.
** Tracking around material (Being fabrication at Reliance Fabrication shop), giving priority to fabrication shop about which members to be taken in priority based on requirement at field.
** Publishing and tracking ETA of structural materials which are on constraints, equipment’s ETA and checking foundation are completed before arrival of equipment’s.
Handling civil front calculation, structural front calculation etc.
** Arranging Isometric drawings according to structure where the line is falling, Follow up with Engineering Department about engineering front available against the scope.
** Accountable of weekly, Monthly & Three Months look-ahead Schedule. Updating actual Progress and all collecting necessary inputs from site and prepare management reports.
** Fixing monthly plans, coordinating all meetings, coordinating actual achieved and reasons for shortfall.
** Updating actual Progress and all related information & comparison analysis.
Project Title :Reliance Petrochemical Ltd. J3 Project Jamnagar Gujarat
Organization : Punj Lloyd LTD.
Duration : 15th Feb 2014 to 11th November 2014
Role : Assistant Engineer
Responsibilities :
** Prepared Planning schedule for 1600 MT Structural fabrication & Erection work.
** Dealt with client, contractors and vendors, attended client progress review meeting.
** Handled breaking the scope of work area wise, materials wise etc.
** And calculated front available for structural work and giving target to site engineers in accordance to available manpower.
** Prepared weekly plan for site structural work and reviewed the MTO and confirmed all the materials are listed as per scope.
** Conducted equipments planning for erection based on availability of equipments and made their connecting members ready.
** Coordinated with Engineering and Construction and liaise with the Client on detail engineering requirements.
** Handled Material & Resources Planning.
** Reviewed and done forecasting of Contractor work front availability and conduct continuity of work analyse.
Project Title :1X250 MW Thermal Power Station unit-7, Parli Maharashtra
Organization :Sunil Hi-Tech Engineers LTD.
Duration : 4th March 2012 to 30th December 2013
Role : Trane Engineer
Responsibilities :
** Prepared Planning schedule for Ash Handling Plant (1X250MW) Thermal Power Plant work.
** Adept in Erection & Fabrication work & review of Structural drawings.
** Successfully executed the Major Structural & Equipment work of AHP in BOP areas.
a) Fabrication & erection of Bottom Ash Hoper, ESP and Equipment Erection for AHP system.
b) Taking civil foundations handover for structure & mechanical erection,
c) Collect the MRC from MSPGCL Parli-V for AHP.
d) HV Motor, Pump, Composer and heavy machine erection and testing.
** Preparation of Daily, Weekly & Monthly progress reports to Client.
** Preparation of Consumables stock requirement & Consumption monthly.
** Inspection of Structural work & CHP Equipment Erection as per FQP,
** Tracking project activities with particular emphasis on quality, safety conformity to drawings, specifications, standards & codes and periodically reviewed schedule.
** Preparation of Daily, Weekly & Monthly program for Erection.
EDUCATIONAL & PROFESSIONAL CREDENTIALS :
** Diploma in Mechanical Engineering, 2012 of affiliation W.B.S.C.T.E. with 71% from BIRLA INSTITUTE OF TECHNOLOGY.
** Completed Higher Secondary, 2008 of affiliation W.B.C.H.S.E. from Tenpur Nabasan Anantaram High School
PERSONAL DETAILS :
Computer Proficiency : MS-Office, MS- Excel & Internet Applications
Date of Birth : 14th April. 1991
Languages Known : Bengali, Hindi & English
Permanent Address : Vill-N.D.Block, Bagnan, Howrah, West Bengal
DECLARATION :
I hereby declare that the above written particulars are true to the best of my knowledge and belief. TUHIN MIDYA
DATE :
PLACE :