Career Objective :
To work in a dedicated and innovative Railway signaling environment to solve uphill task & deliver quality result.
Profile Summary :
Working asProject Engineer/Site In Charge forproject management, team management, project execution, customer & client dealing activity.
Working Experience :
I have 4.7 yearsexperience in project execution, railways signaling, EI(Electronics Interlocking) signaling system installation,testing & commissioning, vital & non vital application logic analysis, trenching, cable laying, cable termination in LB, Foundations casting, maintenance & operation work.
Key Skills :
Project Management,Team management, Project Execution,Electronics Interlocking concepts ,MLK Hot & Warm Stand by EI systems,Railways signaling indoor & outdoor concepts, auto cad, testing & commissioning, MS word, excel & power point ,outlook.
Educational Qualification :
** B.Tech. in Electronics & Communication Engineering from Hindustan College of Sc. & Technology Mathura scored 66.76% in 2012 (UPTU Lucknow).
** Intermediate in PCM from UP board Allahabad scored 71.0% in 2006.
** High School in Science from UP board llahabad scored 70.67% in 2004.
Employment Details :
** Angelique International Ltd. Noidafrom 26.Oct.2015 to Present as a Project Engineer.
** TVM STS Pvt. Ltd. Bangalore from 7 Jan.2014 to 20.Oct.2015 as Consultant.
** JMSG Communication Pvt. Ltd. Delhi from1 Dec. 2012 to 31.Dec.2013 as Site Engineer.
Project Handle :
Project Name :Provision of Indoor & Outdoor signaling works with Electronic Interlocking system for operation of Points & Signals at Sahajadnagar, Dhamaura & Duganpur stations of Moradabad Division.
Company Name :Angelique International Ltd. Noida
Client :Indian Railways.
Duration :March 2017 to Present.
Job Responsibility :
** To do survey before starting the project along with Railway SSE & submit the report to HO.
** To survey the all three station with cable locator & submit proposed cable route plan to Railway for approval.
** Receive the materials from Store (Railway SSE) & responsible for keep it safely in company store & send the at site as per requirements of project execution.
** Execute the outdoor signaling work (foundations casting, cable laying, cable termination , track circuit installation) as per approved SIP, cable core plan , cable route plan, cable termination chart, track bonding plan.
** Manage the site related all requirements economically & report to HO.
** To do the EI rack, Relay rack, CTR ladder erection in SSI room as per approved floor diagram.
** Terminate the relays in relay racks & start the wiring as per approved indoor interface diagram.
** Interact daily with Railway Officers to execute the project and to check the Quality at the site.
** Cooperate and communicate with chief manager and other participants to provide assistance and technical support.
** Perform overall quality control at site (budget, individual performance, schedule plan) and report regularly project progress to Chief Manager.
** Before laying & after termination in corresponding location boxes, meggaring of all type cable performed at site.
** After wiring of SSI room bell testing to be perform with Railway officers & after power on of SSI system SAT to performed with Railway officers.
** To note down the comments given by client during SAT and send it design team & coordinate with them for modification in application logic.
** To prepare the bills for AIL contractors as per contract agreement & work done by them on site.
Project Name :Construction of Roadbed, Major & Minor Bridges, Track Linking (Excluding supply of Rails and Main line PSC Sleepers),Outdoor S&T works, OHE,TSS & General Electrical works from Usargaon (Excluding KM 1265.00) to Bhimsen (Including KM 1334.00) in connection with Doubling between Jhansi & Bhimsen stations on Jhansi Division of North Central Railway in the state of Uttar Pradesh, India.
Company Name :Angelique International Ltd. Noida
Client :RVNL New Delhi.
Duration :Jan 2016 to Feb 2017.
Job Responsibility :
** Prepare, schedule, coordinating & monitor the assigned outdoor signaling project.
** Interact daily with RVNL & PMC to execute the project and to check the Quality at the site.
** Cooperate and communicate with project manager and other participants to provide assistance and technical support.
** Perform overall quality control at site (budget, individual performance, schedule plan) and report regularly project progress to PM.
** To do the billing work with RVNL through SYSTRA(PMC).
** To prepare the bills for AIL contractors as per contract agreement & work done by them on site.
** To execute the all type of outdoor work (including cable laying, foundations casting, cable termination, point wiring, track circuit installation, CT rack erection etc.)
** To put daily RFI to SYSTRA for site visit, quality assurance & billing work.
** To compile the all RFI (trench excavation, cable laying, bricks placing, DWC half split fixing , trench less boring , back filling) of MALASA station as per BOQ.
No.& prepare the its summary to draw BAR Chart to claim bill from RVNL.
Project Name :EI alteration work at Keshav Ganj for doubling of station in NWR Ajmer division.
Company Name :Angelique International Ltd. Noida
Client :Indian Railway.
Duration : From Oct.2015 to Dec. 2015
Job Responsibility :
** To manage the site requirements and purchase the materials required for system.
** To do the bell testing & SAT(Site Acceptance test ) with railway staff for alteration wiring.
** Arrange the man power for outdoor work.
** To execute the project within the specific time limit.
** Economically handle the project.
Project Name : Gambhiri Road (Ratlam Division WR) station EIDual VDU installation work
Company Name :TVM STS Pvt. Ltd.Bangalore.
Client :Indian Railway.
Duration :From Feb.2015 to Oct.2015.
Job Responsibility :
** Manage the site requirements and handle theproject related issues.
** To guide the team of wireman for installation of HOT STAND BY MICROLOK EI system.
** To check the whole wiring with railways staff by bell testing.
** Check the TOC (Table of Control) & Cross table at time of simulation with ADSTE.
** Prepare the ATIR(Acceptance Test Incidence Report ) and send it to design team.
** Prepare the list of materials consumed at site and remained at site and send it to office.
** Weekly send the work progress report to office.
** Economically handle the site requirements with minimum man power.
** Execute the project with co-ordination of other departments.
** Commissioned the station with team member and railways staff.
Project Name : Godhani Station (Nagpur Division CR) & Bhiwani station(Bikaner Division NWR) EI installation work ,
Company Name :TVM STS Pvt. Ltd.Bangalore.
Client :Indian Railway.
Duration :From June 2014 to Jan 2015.
Job Responsibility :
** Manage the site requirements and handle theproject related issues.
** To guide the team of wireman for installation ofMICROLOK HOT standby & Kyosan (K5BMC) EI system.
** To check the whole wiring with railways staff by bell testing.
** Check the TOC (Table of Control) & Cross table at time of simulation with ADSTE.
** Prepare the ATIR(Acceptance Test Incidence Report ) and send it to design team.
** Prepare the list of materials consumed at site and remained at site and send it to office.
** Weekly send the work progress report to office.
** Economically handle the site requirements with minimum man power.
** Execute the project with co-ordination of other departments.
** Commissioned the station with team member and railways staff.
Project Name : Jhilo to Renval(Jaipur Division) total 12 station maintenance work.
Company Name :TVM STS Pvt. Ltd.Bangalore.
Client :Indian Railway.
Duration :From Jan 2014 to May 2014.
Job Responsibility :
** To attend the EI failures as possible as .
** Monthly maintain the EI system.
** Prepare a failure report and send it to office as well as Railway.
** To get the satisfaction certificate from Railway SSE.
Project Name :Kolhapur (CR) & Bena (Bhopal Division WCR) station EI wiring work.
Company Name :JMSG Communication Pvt. Ltd. Delhi.
Client :Ansaldo STS Noida.
Duration :From Dec.2012 to Dec .2013.
Job Responsibility :
** Manage the site requirements and weekly report to office about work status.
** Ensure the correct erection of all racks as per room floor diagram.
** Economically handle the site requirements and guide the team of wireman for installation.
** To do the documentation for materials issued from customer.
** Checkthe all wiring by bell testing, as per provided drawing from customer side.
** Check the TOC(Table of Control ) for interlocking testing with customer at simulation board.
Declaration :
I am accepting here that all above information provided by me is true as per my knowledge.
Date :
Place :