Curriculum Vitae :
Post applied for Mechanical Engineer (Piping-Assistant).
Objective :
Experienced Piping Engineer/Supervisor with 7years’ experience in the Pipeline, Tankage Fabrication & Erection, Equipment Erections, also with Structural Fabrication & Erection, Installation; seeking a challenging Piping engineer/Supervisor position for application of my experience to new areas of challenge, increasing exposure to technology & business practice.
Personnel Details :
Name : Niranjan Kumar Singh
Marital status : Married
Father Name : Shri Indrajeet Singh
Languages Known : English, Hindi
Address : Vill+Post-Dandopur (Barhara Ganj), Dist-Kushinagar(U.P.-274304)
Qualification :
** HSC from UP Board
** Diploma in Mechanical Engineering. (Board of Tech Education Bangalore) in 2010
** Post graduate diploma in Process Piping B 31.3
** ASNT Level II in 2011 – RT, PT, MT, UT
** Course to Computer Applications. (MS Office, Auto-CAD, Plant Design Management System (PDMS11.60)).
** PTW training from ADCO Abu Dhabi (UAE)
** Confined Space Entry training from ADCO Abu Dhabi (UAE)
** H2S training from ADCO (Abu Dhabi)
Extra Curricular Activities :
** Efficient to performed work under high level of quality and safe environment in mutual and intellectual process.
** A sound level of ability to set goal and achieve same by teamwork.
** A mutual understanding and communication between field sub-contractor supervisor and project management team.
** Habitual to do each work in proper order by own motivation and aim to quality than quantity everywhere.
** Proficient to create a positive and creative surround at working site.
** Good Administrator and well conversant in Site & Office works.
** Perfectionist, Set high standards, Very schedule-oriented and detail conscious, neat moreover, tidy, do things persistently through, faithful.
Employment History :
In India :-
1. Dorman EnggPvt Ltd :
** Started Working as a Trainee Engineer at BPSL Sambalpur site-Orissa from 09/08/2010 to 15/07/2011.
** Learned about the Structural materials viz ISMB, ISHB, ISIB, ISA, ISMC, - Gusset Plates, Stiffener Plates etc.
** Structural fabrication & erection ( Marking, Cutting, Welding of Structural-Materials )
** Piping fabrication & erection Work (CS & SS)
** Safety Precautions in Industrial Construction Work ( Tool Box Talk, Site Induction, Permit to work, Job Safety Analysis, Method Statement, Risk Analysis )
** Material handling
2. Jyoti Engineering Company :
** Worked as Piping Engineer on Nocil (RCD) Site Thane-Belapur Road, Navi Mumbai From 28/07/2011 to 25/08/2012.
** Work includes Structural as well as Piping Work
** Piping Materials – ASME A106 Gr B , ASME A 53 Gr B ( Max SCH 80 ), SS-316
** Piping fabrication & erection ( includes onsite / offsite Fabrication & erection )
** Preparation of Fit up Report, Joint Measurement Record, Preparation of BOQ for materials & billing purpose
** Alignment of Columns, Beams, Hopper, ID Fans etc.
** Preparation of Site records (Government Registers, MIR, and TC & QAP of Materials).
** RA Bill preparation for per month billing purpose.
3. R.D.Engineering :
** Cadbury India Ltd, Revamping Project, Malanpur-Gwalior from 15/01/2014 to 18/04/2014.
** Hindustan Unilever ltd, Liquid Project – Pondycherry and Consultant – L&T Infotech Services since from 17/11/2014 to 25/01/2016.
4. Randen Engineering Pvt Ltd :
Hindustan Unilever ltd, Liquid Project – Chiplun since from 28/01/2016 to 25/10/2016.
** Piping, Pipe Rack, Pump Erection Work
** Pipe Material SS 316 & 316L , SS 304, CS (ASTM A53, A106)
** Applications of piping as Utility & Process Lines ( Chilled Water Line, Colling Tower Line, High Pressure Steam Line, Recirculation/Condensate line, Compressed Air Line, Nitrogen Line, Ingredient Water Line, Domestic Water Line ).
** Pipe fabrication & erection on site work
** Pipe Supports with Insulation & Cladding work.
** Preparation of Fitup Report, Joint Measurement Record, Preparation of BOQ for materials & billing purpose
IN ABROAD & GULF :-
1.
Company Name – Madina Group WLL :
Roll At site - Piping Supervisor
Project - Ras Gas Steam Header Project, Qatar
Duration of Work - 09/09/2012 to 18/01/2013
2. Company Name – Towell Engineering Services Co. LLC, Oman :
Roll At site - Piping Foreman
Project - Short Term Project
Duration of Work - 25/06/2013 to 29/12/2013
3. Company Name – RD Engineering :
Roll At site - Site Engineer
Project - Unilever Africa Ltd, South poll Project –
Johannesburg – South Africa
Duration of Work - 20/04/2014 to 14/07/2014
4. Company Name – RD Engineering :
Roll At site - Site Engineer
Project - Unilever Africa Ltd, Waterfall Project –
Johannesburg – South Africa
Duration of Work - 19/08/2014 to 16/11/2014
Current Employment Detail :
Company Name : ABU DHABI COMPANY FOR ONSHORE PETROLEUM OPERATIONSLTD. (ADCO) on Deputation from OSMAK ENGINEERING & CONTRACTING LLC – ABU DHABI
Work Place : Al-Dabbiya Surface Facilities Phase-III
Scope of Work : Piping Fabrication & Installation with Supporting
Roll At site : Piping Construction Engineer - Assistant
Duration Of Work : Nov 2016 to till date
In my last & Current Projects, I have supervised Hydro testing, Pneumatic testing, Leak test & Flushing as per Design Requirement and Also Involved in QA/QC inspection like Material Inspection, Welding Inspection. I could be useful & helpful for these types of works.
Summary of Experience & Technical Knowledge :
1) Installation for both New & Existing plant :-
a) Piping Installation.
b) Structural Steel and Support Installation.
c) Storage Tank Installation.
d) Mechanical Equipment Installation.
** Review and Understand Project Contractual Requirements.
** Review and Understand Client Specification and Requirements.
** Familiar with Construction HSE Safety Standards & Procedure.
** Prepare Installation Schedule and Activity Estimates.
** Prepare Installation Method Statement and Procedures.
** Preparation of Daily Progress Report and Work Plan for Next Day.
** Daily Meeting with the Client Representative and assessment of Job.
** Allocation of Manpower on Daily and Weekly Basis and Identifying Manpower Resource Requirements.
** Solving Technical Issues during Construction Activity.
** Fabrication and Installation of Piping with Support.
** Possess good technical knowledge in conducting QA/QC inspections which include.
** Material Verification & Traceability, Fit-up &Visual Welding Inspection.
** Welding Procedure Qualification Test (WPQT) and Welder Qualification Test (WQT).
** Pipeline welding (SMAW & GTAW)
** Non-Destructive testing (N D T) Inspection, which include Radiography Interpretation & dye penetration inspection.
** Piping & Instrument Diagram (P&ID) with Prepare Hydrotest Packages.
** Hydrostatic test, Pneumatic Testing, Leak Test & Flushing Inspection.
** Pump/ Motor Alignment Inspection.
** Preparing & Producing Quality Assurance Plan (QAP)
** Welder Procedure Specification (W P S) & Procedure Qualification Records (P Q R)
** Inspection & test plan (I T P), fabrication & erection procedure.
Work to most of the construction codes & standards such as :-
ASME SEC IX, ASME B31.3, API650. W P S & P Q R as per ASME SEC IX.
1) Experience in Plant/QC & welding inspection activities in offshore piping Equipment & piping fabrication.
2) Inspection & Project co-ordination involved in Offshore
3) Mechanical -QC activities for lay-up after the hydro test of piping.
4) Planning and organizing welding inspection activities.
5) Welding inspection - radiographic interpretation.
6) Hydro test Witness the piping and all related plant equipment.
Acknowledgement :
I have total 7 years’ experience after the completion my study in relevant field as a Trainee Engineer, Piping Engineer. Piping Work, Structural Steel, Piping fabrication, Erection piping (on plot & off plot as well as prefabrication) and also have good knowledge about tank, duct, cyclone, riser, hopper fabrication & erection.
Date :
Place :