Welcome Guest

Piping / PDS / PDMS >> Piping Fabrication/Construction/ Foreman 
Piping Fabrication Supervisor Resume Sample, Experience : 13 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Piping Fabrication Supervisor
Job related skills / software:Piping Projects Fabrication Erection & Commissioning
Category:Piping / PDS / PDMS
Sub Category:Piping Fabrication/Construction/ Foreman
Years of Experience:13 years
State:West Bengal
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

S. M. Ahsan Ullah
Mobile  : +88 01732 890 880, +88 01929819663, +971 50 7921230(sms),
Email : sanaullah1981 AT yahoo.com, ahsanullah1981 AT gmail.com

A competent and dynamic Mechanical engineering professional with a successful career spanning over 13 years in Operations & Maintenance, Fabrication, Erection & Commissioning, Project Management etc with reputed Petrochemical, Refinery, Oil & Gas industries. Expertise in managing Mechanical plant, piping projects right from preparation of piping layout, BOM calculation, installation of piping structures and testing
Seeking a challenging ManagerialAssignment inProjects and Maintenance Management,piping engineering Operation with a organization in Oil & Gas / Petrochemical sector

Professional Synopsis :
A technically adept professional with excellent management skills and ability to execute critical projects right from their planning to completion.
In-depth knowledge of engineering fundamentals backed by valuable hands on experience handling installation, commissioning, testing and maintenance of Rotary and Static Plant equipment, Piping works for the both of Green and Brown Field Projects.
Proven competencies in developing & streamlining systems with ability to enhance operational effectiveness and meet operational goals within the cost, time & quality parameters.
Solid management capabilities with a consistent track record of anticipating consequences of new designs, initiating solutions intellectually and completing projects to specifications
An effective communicator with exceptional relationship management skills with ability to relate to people at any level of business.
A good teamleader with ability to guide and motivate the teams to achieve organizational goals.
Worked with PIL- Petrofac Int'l Ltd, Abu Dhabi, in the capacity of Supervisor, piping.

Core Competencies :
Project Management
Operations and Maintenance
Fabrication
Erection & Commissioning
Piping Projects
Vendor Development
Value Engineering
Resource Optimization
Quality Assurance
Troubleshooting
Root Cause Analysis
Estimation & Cost control
Process Optimization
Inspection & Testing
Negotiations & Contracts
New Systems Implementations
Site Coordination
Team Management

Technical Skills :
HandlingInstallation, Commissioning and maintenance of the following Plant equipment
Centrifugal, Reciprocating and Rotary pumps
Centrifugal Compressors
Air Compressors

Mechanical Seals  : Single, Double, Tandem and Cartridge seals, having single, multi-spring and bellows
Gear Box and Fin Fans / Blower’s

Valves  : Gate valves, Globe Valves, Needle valves and pressure and safety valves
Static Equipment like Heat Exchangers, Columns and Vessels

Piping Woks :
Knowledge of ASME, ANSI, ASTM, API and NACE standards
Preparation of piping layout
Equipment specifications
Hydro testing
Final inspection of pressure vessel, heat exchangers, fired heaters, compressors and other allied equipments required for oil, gas and petrochemicals project.
Inspection and testing of C/F pumps, valves, pneumatic valves
Fabrication, erection of piping components, pipe supports, fittings and valves etc.
Test packs, punch lists for piping work.

Key Functional Areas :
Project Management :
Responsible for managing all activities from project planning to its successful execution within the stipulated time and cost parameters which included
Estimating resource requirements, procurement of material and spares from vendors, negotiating commercial and delivery terms with suppliers, conducting regular quality audits.
Preventive and corrective maintenance of equipment and machinery and their upgradation to ensure smooth workflow.
Devising and employing various techniques for ensuring optimal utilization of resources to achieve cost reduction.

Maintenance Operations :
Handling the routine preventive maintenance and trouble shooting activities to achieve high productivity by reducing breakdown time.
Analyzing each process and machinery involved regarding their specified safety parameters to ensure a safe working environment.
Conducting enquiries and investigations of machinery failures, monitoring all the processes involved to take corrective action.
Identifying areas and opportunities of improvement, recommending process modifications.
Arranging resource requirements such as manpower, machinery, materials and ensuring their optimum utilization.
Conduct regular quality inspections for preservation of engineering equipment and stores.

Piping Projects :
Preparation of Piping study layout, equipment layout & plot plan (process & utility) as per process requirement.
Coordinating with other engineering disciplines regarding any inputs or changes in engineering design which need to be incorporated to finalize piping design layout.
Preparing the work plan for the piping department to draw up the quantum of work and work out the schedule/plan for deployment of resources.
Mobilizing materials, tools, tackles, manpower and controlling allocations to site requirements.
Fabrication, erection of piping components, pipe supports, fittings and valves etc.
Instructing for Piping layout, Piping Class and Standard pipe supports
Preparing Pipe support design & selection from support standard
Controlling cost and improving productivity in construction work, progress monitoring and expediting work at sites.

Administration :
Planning of daily work schedule and major maintenance and allocation of manpower.
Coordinating with other departments to streamline the activities to ensure proper workflow.
Ensuring safety of personnel and equipment at working places.
Maintaining necessary documentation and preparing reports for analyzing the various processes.
Motivating and training the subordinate team members and conducting regular performance appraisals

Career Summary :
PIL- Petrofac Int'l Ltd, Abu Dhabi, UAE
Supervisor, Piping Feb 2011 to Feb 2013.
Project  : EPC for ASAB FFD- Full Field Development Project, Abu-Dhabi Company for Onshore Oil Operation (ADCO)
Scope  :Additional wells, RDS (Remote Degassing Station), CDS, (Central Degassing Station) flow lines, replacement and modification of existing facilities and building new surface facilities that will sustain production targets from 2011 through 2045
Responsibilities  :Provide technical supports to the Brown Fields sub-contractor, coordinate with Engineering between Sub-Contractor for the RDS’s and Oil Well heads construction activities and pipeline/ piping work, ensure compliance to standard specifications and safety standards
CCIC- Consolidated Contractor's Int'l Ltd., Abu Dhabi, UAE

Supervisor piping May 2006 – Feb 2011 :
Project  : Abu-Dhabi Polymer Company, Ruwais, Abu-Dhabi, Borouge EU3 Project, Jul 2010- Feb 2011
Scope  :Construction of Plant at Borouge facility, to produce Ethylene using 5100T/D (as 100%) of ethane feedstock, operating with a 95% nominal service factor and producing 1,44 MMT/YR of ethylene, propylene and hydrogen.


The plant consisted of the following: Furnaces area comprising of seven cracking furnaces, cracked gas compression unit, refrigeration unit, and separation unit. Cost: US$357 Million
Responsibilities  :In charge of all the activities related to the fabrication shop “piping & pipe supports”, painting activities “structure, piping and pipe supports”. Coordinating between all the activities starting from engineering works, material collection, fabrication, PWHT, X-ray, painting etc, to ensure compliance to standard procedures and specifications.
Project  : Borouge2 Polyolefin’s unit product handling and Marine Facilities, Jan 2010 – Jul 2010
Scope  :Construction of Polyofin’s and marine Facilities Plant including mechanical work, site preparation, civil work, buildings on EPC basis, E&I works, tanks, heavy lifting & insulation
Responsibilities  :Primary responsibility for site piping fabrication and erection, Test pack, Punch list items clear activities, assisting piping technicians in understanding the ISO,GA and P&ID’s design, technical specification as well as international codes and standards. Monitoring the progress of project and ensure compliance to all specifications. Providing technical support regarding technical issues during the warranty period after completion.
Project  : Borouge EU2 Plant, Apr 2009 – Jan 2010
Scope  :Construction of Ethylene Plant at the Borouge facilities in Ruwais including: mechanical work, site preparation, civil work, buildings on EPC basis, E&I works, tanks, heavy lifting & insulation. Cost: US$393 Million
Deliverables  :a) Functioning as in-charge for all piping and pipe supports erection, fabrication and reinstatement, closing of all mechanical completion items, pre commissioning items, shut down and maintenance activities for the Furnaces, Boilers, wash water areas, process area and pipe racks area with all related field works.
b) Handling  : All mechanical and piping technical issues, drafting, mark up drawing, preparing prefabrication spools; Piping and pipe supports materials takeoff and materials purchasing requisitions.

c) Preparing all piping support drawings, follow up all technical queries and concession requests with the client.
Project  : GASCO- Ruwais NGL Train 3 Project(RT3), May 2006 – Apr 2009
Scope  :EPC building works, construction of civil, mechanical & E/I works for all the project excluding marine works and jetty & cryogenic tanks for new fractionation/refrigeration unit, stream plant, utilities, new LPG & DEO treating, amine regeneration, sulfur recovery unit, sour water stripper unit, future naphtha hydrotreater,& future hydrogen manufacturing unit.
Responsibilities  :Acting as In-charge of Fabrication Shop “Piping and Pipe Supports”, connected line between engineering and the fabrication shop and the safety rules. Coordinating between Fab.-Shop- X-Ray, Painting. Aligning all the paining site piping activities with the relevant Snamprogetti & Gasco Engineers / Supervisors. Applying for work permits, providing immediate supervision on the site piping activities to make sure that all permit conditions. Pre commissioning, commissioning and technical support regarding technical issues during the warranty period after completion.
Larsen & Toubro Ltd., Bangladesh
Mechanical Engineer, Aug 2005 – May 2006
Project  : EPC for-Lafarge Surma Cement Mills Ltd., (CTI Group France), Chhatak, Sylhet, Bangladesh.
Scope  :EPC building works, construction of civil, mechanical & E & I works for all the project excluding Separator unit, Kilinker & Cement Silo, Kiln Unit, ESP unit, jetty & Long Belt conveyor unit to transfer stone from India to Bangladesh, utilities, sour water stripper unit
Responsibilities  :Erection & Commissioning of various mechanical equipments Such as Kiln, ESP, Raw Mill, Separator, belt conveyors, dust Collector, centrifugal fans, compressors, centrifugal pumps etc. Plant overall natural gas supply system for various burners’ equipments. Conducting Welder Qualification Test (WQT) as per the WPS and PQR. Mentoring the Inspection Team to conduct various NDT (DPT, RT, MT, UT, etc.) for the quality assessment.

Previous Assignments :
EIS-Engineering Information Services, Bangladesh
Mechanical Engineer, Jul 2002 – Jul 2005

Projects :
EPC for H.P Chemicals Ltd. (Hydrogen peroxide manufacturing process plant of concentration 35%), Narayangoanj, Dhaka, Bangladesh.
EPC for Premier Cement mills Ltd., Munshigonj, Dhaka, Bangladesh

Responsibilities  :
Functioning as In-charge of all Piping Activities & above Ground Installation Facilities and of all rotary & Static equipment such as Pumps station & Compressors Station, Centrifugal Fan, Blowers, Packing Units Conveyors (Belt, Screw, Chine & Bucket Elevators), column, vessels, etc.
Speed Builders Engineering Ltd, Bangladesh

Mechanical Engineer, May 2001 – Jun 2002 :
Project :
Civil, Mechanical, E&I construction works of M.I Cement mills Ltd. (A Organization of Molla Group of Industries), 1800 TPD Cement manufacturing company, Dhaka, Bangladesh

Education :
Diploma in Mechanical Engineering, Barisal Polytechnic Institute (BPI) Barisal, Bangladesh, 2000

Trainings :
Industrial Training, BITAC-Bangladesh Industrial & Technical Assistance Center, Dhaka, Bangladesh.
PTW- Permit To Work, Petrofac House Sharjah, UAE
Brown Fields and General training for Health and safety environment (HSE), from PIL Training Center, ASAB, Abu-Dhabi, UAE
Training on Advance risk assessment techniques, Construction safety norms, Erection Planning and control systems, Construction procedures and projects Management, Raw mill maintenance, MAXIMO Template, Basics of vibration, Advance inspection techniques, Failure analysis and trouble shooting, Welding and NDT techniques, General Management and Behavioral, Self Developments.

Personal Details :
Date of Birth  : 5th Jul 1981
Nationality  : Bangladeshic

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.