Amrinder Singh :
Contact : +919621240949 /+91 8894320894/ +91 8054150915
E-Mail : singh.mechqa8054 AT gmail.com
Top Level Assignments :
Quality Assurance & Quality Control
Career Precise :
** Hard working professional offering nearly 7+ years ofexperience in Quality Assurance, Inspection & Testing, Power Utilities. Adept at carrying out required tests and inspection for various welding processes and checking the quality standards of final execution and alignment of boiler Furnace Demonstrated acumen in ensuring that processes - are conducted in accordance with specified FQP, EWS (Erection Welding Schedule) and Indian Boiler Regulation, Deft in carrying out heat treatment related job function with more challenging assignments in prestigious Thermal power construction projects in India.
** Possess good communication and negotiation skills and able to successfully deal with Government Body, Customer, Consultant and Foreign Experts to enhance the quality effectiveness of work executed.
Career Scan :
(1.) Since Jan-2012 to Till Date :
Organisation : -M/s KARPARA PROJECT ENGINEERING PVT.LTD
Position : QA/QC Incharge
Customer :- M/s PRYAGRAJ POWER GENERATION COMPANY LIMITED (A subsidiary of M/s JAYPEE)
Client : M/s BHARAT HEAVY ELECTRICALS LIMITED (A Govt. Of India undertaking)
Project :- 3x660 Mw Super Thermal power project-Lohagra-Allahabad (UP.)
(2.) From March’2010 to Jan’2012 :
Organisation : - M/s ZILLION INFRAPROJECT ENGINEERING PVT.LTD (Formerly known as Durha Constructions Pvt. Ltd)
Position : Planning/Welding Supervisor
Customer :M/s HINDUSTAN MITTAL ENERGY LIMITED (A Joint venture of M/s Mittal Energy limited and M/s Hindustan Petroleum Corporation limited)
Client : -M/S BHARAT HEAVY ELECTRICALS LIMITED AND ENGINEERS INDIA LIMITED (A Govt. Of India undertaking)
Project :- 153Mw Captive Power Plant (2 x110 TPH HRSG’s & 4 X 240 TPH UB’s) at Guru Gobind Singh Refinery project-Bathinda(Pb.)
Core Competencies :
Quality Assurance :
** Devising and implementing quality assurance in compliance with company requirements.
** Prioritizing quality assurance responsibilities based on the requirements of the project as well as of the Customer satisfaction in the execution of the job as per the scheduled programme.
** Reducing zero hour failures at customers end by controlling the quality during erection and alignment work with effective feedback & closure systems.
Inspection & Testing :
** Inspecting and testing of Boiler material during erection and alignment work at site as well as to check the welding processes i.e. GTAW and SMAW as per requirements of customer.
** Establishing testing procedures to determine the final placement of material as per ASME standards and work procedures of Quality assurance and Quality control.
** Familiar in using International Codes, Standards and Specifications i.e. ASME, ASTM etc.
Duties and Responsibilities :
** At 153Mw Captive Power Plant (2 x110 TPH HRSG’s & 4 X 240 TPH UB’s) at Guru Gobind Singh Refinery project-Bathinda(Pb.)
** Quality checks during Pre-assembly and erection of Boiler pressure parts.
** Erection and alignment of Boiler accessories like Ceiling Girders, safety valves, ERV, Soot blower, wall blower, temp probe and SV- silencer and Boiler Drains, vents, SB, WB piping, etc and Erection of Pressure parts vertical and side wall panels etc.
** Hydro test of Boiler Furnace, Boiler piping, commissioning assistance of Boiler as per BHEL procedures and specifications.
** Fit up and welding of water wall panels, there connections with Headers, welding of loose tubes of headers and coils.
** Preparation of Fit up and weld visual reports along with Line History Sheets of High pressure joints along with prescribed Hydro test pack format as per the specifications of customer’s FQP and EWS.
** Radiography of high pressure joints and their acceptance from the customer as per quality standards and general acceptance criteria.
** Dye penetration testing of Socket joints wherever was applicable and their acceptance.
** Systematic, ANALYTICAL and result oriented work with in specified budget & plan.
** Preparation of Micro as well as macro planning which includes the monthly & weekly erection programme as per Erection sequence, situation and availablity of materials at site.
** prepare the detailed programmes of hydro test as well as light UP (micro plannig) AND work acordingly.
** making daily progress reports as per the prepared plans for the month
** Deals with billing of erection and alignment of boiler material,pvc(price variation cost),extra work conducted at site,orc(over run charges)due to extension along with material handling billing and its recoincillation with client.
At 3x660 Mw Super Thermal power project-Lohagra-Allahabad (UP.) :
** Quality control during Pre-assembly and placement of Boiler ceiling girders, Welding of high pressure joints of Side water wall panels, intermediate panels, burner panels, Hopper panels,
** Pre-assembly and alignment of Boiler upper furnace roof panels and lower furnace roof panels, welding of joints with roof headers, LTRH coils, Platen Super heater coils, Finish super heater coils, upper furnace ring header’s joints welding and lower furnace ring header joint welding.
** Review/Approval of Inspection & Test Plan/s, Quality Control procedures, Method statement/s, Welding Procedures etc.
** Fit up, welding and alignment of Boiler critical piping which includes Main Steam line piping, HRH,CRH,LPBP,APRDS,HPBP and their drains and vents.
** Monitoring / Witnessing all the Welding, Fabrication & Erection related activities as per client approved Inspection & Test Plans/Quality Control procedures.
** Inspection of incoming materials and reviewing test certificate as per code
** Inspection of piping materials identification as per isometric drawings.
** Witnessing of activities like PQR, Welder’s qualification Tests, Mechanical testing and preparation of PQR records and WQT certificates.
** Stage wise inspection before, during and after fabrication.
** Review of radiographic films, Witnessing of UT, MPI, DPT, Hardness, PWHT and review of test reports.
** Review of Daily Welding reports & Welding Pipe book.
** Witnessing of Weld repair activities as per client approved WPS.
** Line walk and Punch List preparation before Hydro Test
** Review of Hydro test packages
** Witnessing of Hydro testing, as per client approved procedures.
** Verification of Reinstatement of Piping systems after completion of all hydro testing activities
** Verification Mechanical completion Package.
** Welding inspection activities before and after welding as per the project specification.
** Co-ordination with third party inspection/client as per contractual requirements.
** Review of calibration and validation certificates of NDT equipments such as Temperature recorders, heating machines, hardness tester, heating coils, thermocouples, Heating and drying oven, Baking ovens, welding electrodes and filler wires time to time.
** Review of Welding processes used in Boiler i.e.
GTAW, SMAW of materials P-91, P-22, Sa106GrA, GrB, Grc, SA213TP347H, SA213S304H etc.
** Preparation of NDT documents such as fit up reports, weld visual reports, PWHT records, Line history sheets wherever is applicable.
** Ground inspection of Boiler pressure parts and critical piping materials with codes by Director of Boilers of the state where the job is executed.
** Stage wise submission of NDT documents, radiography films duly accepted by the customer to the Director of Boilers as per Indian boiler regulations.
** Witness of Boiler Hydro test, Boiler, Light up, Steam blowing, Synchronisation, Safety valve floating by the Director of Boiler.
** Clearance of FORM-V from the office of Director of Boiler after verification of all the necessary documents for the successful operation of unit.
Highligths :
** Non-Drainable Hydro test of 660Mw Boiler without any generic failure.
** Light up of 660mw unit in the very first attempt without any failure in oil gun operation.
** Steam blowing in 28 days which was the best performance in all the three units of super critical thermal power plant.
Technical Certifications :
** ASNT-Level-II –Radiography testing certificate no. (361141).
** ASNT-Level-II- Dye Penetration testing certificate no. (361140).
** ASNT- Level-II- Magnetic Particle Testing certificate no.(130311A)
** ASNT-Level-II – Ultrasonic Testing certificate no (130311D).
Scholastics :
Degree in Science from Himachal Pradesh University Shimla in 2009.
IT Skills :
Well versed with MS Word, MS Excel, MS PowerPoint, Windows XP, Windows Vista, MS Project.
Achedmic Achievments :
** Awarded scholarships in Middle and Matriculation Examinations from State Board.
** Attain Merit position in State Board Matriculation Examinations.
Personal Profile :
Father’s Name : Sh.Gorkhi Ram
Mother’s name : Smt.Satnam Kaur
Date of Birth : 08th September 1986
Languages Known : English, Hindi & Punjabi
Permanent Address : VPO-Larhoon Via Rehan, Teh-Nurpur, Distt-Kangra(Himachal Pradesh),Pin-176022
Marital Status : Married
Current Salary : 28000 /-Pm (After all deductions)
Expected Salary : 40000 /-Pm (After all deductions)
Notice Period : One month from the date of joining letter
Declaration :
I do hereby declare that above furnished details are true to the best of my knowledge & belief.
Place :
Date :