EDUCATIONAL QUALIFICATION :
COURSE INSTITUTION YEAR OF PASSING
S.S.L.C Sankar Higher Sec. School, SankarNagar, Tirunelveli. 1992
D.C.E. St. Xavier’s Polytechnic, Sythunganallur, TVL. April – 1998
TECHNICAL QUALIFICATION : Typewriting English Lower Grade passed in First Class
WORK EXPERIENCE :
Name of the Organization Designation Nature of Work Duration
M/s. Karthick Constructions,
Tiruneveli,
(From May 98 to Jan 2006) Site Supervisor Preparation of Plans and Estimates, Bills & Complete Execution of Industrial, Commercial, Residential Building Work, Execution of Thermal Power Plant. 7 Years
8 Months
M/s URC Construction Pvt. Ltd., Vizag
(From Jan. 2006 to Sept. 2008) Assistant Engineer 2 Years
8 Months
M/s ECCI Construction Pvt. Ltd., Chennai.
(From Sept. 2008 to Till Date) Senior Engineer 3 Years
8 Months
Total Experience 14 Years
JOB PROFILE :
Preparation of Plans and estimates for all types of industrial, residential, buildings, Bill Book, Bar Bending Schedule.
To read all type of civil engineering drawings.
Execution of Civil Works like.
Setting out and marking the building at site as per drawings.
To control the quality of works as per specifications & standards.
To control and handle the labours & labour contractors.
To prepare bills for labour contractors.
To close monitoring the projects from excavation, dressing of soils, foundation footings, coloumns, beams & deck slabs.
To prepare bar chart for labours, materials requirements and bar bending schedule for steel.
Much interest in Architectural elevation works.
Execution of Thermal Power Plant.
Interest in Social Activities
Can drive two wheeler & can work in any climatic condition.
Well known in Concrete works & Brick works.
EXPLANATION OF JOB PROFILE & KEY SKILLS :
The following items are done by me, individually & outrightly.
1. In Bangalore Multilevel Car Parking worksite :
I completed the slab concrete 348m3M25 within 12 hours , on 24122008.
(1/4)th portion of the area was under my control & I completed the slab concrete & column concrete individually.
2. In Tamilnadu Legislative Assembly –Chennai :
The no of 58 columns from pile footing to the slab bottom work was finished by me.
The 65 nos plinth beam concrete which is connecting every pile footing was done by me ,a single man of mine.
I received the assistance from the side of the department to construct the following work -From the plinth beam bottom to top 5m level, I finished the work in the following method ie., sand , gravel,20mm metal using the roller, I rolled on it correctly &I completed (M25) concrete & I controlled the full labours.
I worked very hard , so I got promotion as a Senior Engineer in this company on (15102010 ).
I received the assistance from the PWDEngineers, I finished the 250m3 concrete within 1 day.
3. Bascon Tower in Chennai :
In this site , I finished all the Block work &Plastering from 1st floor to 6th floor (ie., Tower A & Tower B) within the period of time.
4. Surya Power Plant in Kavaraipettai (Gummidipoondi – Thiruvallur District) :
(ie., present working site) :
I received the assistance from the side of department , I finished (ESP/AHP) control room work within the period of time.
I completed 150m3 concrete within 1 day.