Objective :
To be a competent professional, using the latest ideology and technology in global information and telecommunication technology to make a meaningful impact for sustainable development in the public and private sectors of the developing countries worldwide
Work Experience :
An Engineering graduate with 3.8 years Experience in Mobile telephony in the area of operational and maintenance, Installation and Commissioning, Integration, Expansion, Swapping, Quality Audit (QA) of NSN & ERICSSON BTS & Transmission Equipment.
Current Status :
Working with NSN India PVT.LTD. Through Nice Telecom Pvt. Ltd. Aircel (MAXIS PROJECT) and TATA 3G Project from 1`-DEC’09 to till date.
Organization : Nice Telecom PVT. LTD. JAIPUR
Designation : BSS Engineer (PROJECT CO-ORDINATORE).
Equipment knowledge :
Working on Following NSN Equipments IN MAXIS PROJECT :
** FLEXI EDGE BTS (FIIA&FIOA&STACK BTS)
** FLEXI HYBRIDE(TRANSMISSION EQUIPMENT)
Working on Following NSN Equipments IN TATA 3G PROJECTS :
** NODE B- BTS(FRGP CARD)
** NODE B –BTS(FSMD CARD)
Job Responsibility :
** 3G BSC Sites are completion of TATA 3G Network in Rajasthan circle.
** Responsible for BSS technical activities in MEXIS&TATA 3G Project from Nicetel.
** Acceptance test for BTS.
** Commissioning of WCDMA (NODE B) Equipment like FRGP &FSMD.
** Alarm Handling of OMC, BSC and BTS & take necessary action to rectify the problems.
** Operate Fault Management, Configuration Management & Performance Management in Sites.
** Analysis of KPI on daily basis.
** Solving customer problems and proper escalation to seniors and managers.
** Version up gradation of BTS from OMCR & Software Up gradation of BSS from OMCR in MEXIS PROJECT.
** Installation, Commissioning and Integration of NSN FLEXI EGDE BTS, FIIA, FIOA equipments, Microwave antennas, Transmission equipments LIKE HYBRIDE.
** Coordinating with Installation Team for antenna swapping BTS installation and mw installation etc. depending on requirements parameters.
** Co-ordination with planning team for RFI survey for the new sites in the zone.
Previous Experience :
Working with NSN India Pvt. Ltd. Through ZEPPELIN MOBILE SYSTEM INDIA LTD On Airtel** Bharti Project in Maharastra&Goa Circle from 7 Jan to Nov10.
Organization : ERICSSON India Pvt. Ltd
Designation : Transmission Engineer
Job Responsibility :
Installation and Integration of new Sites (BTS&Transmission) in given Cluster
** Responsible for carrying of new site Installation & commission of Hybrid for Transmission in Site.
** Possess functional Knowledge of NSN Software and Hardware systems required for Configuring and Commissioning of equipments, BTS equipments (Antenna, RF parts, etc), Transmission Equipment(M/w)
** Installation, Integration, Expansion, Swapping of type of Outdoor & Indoor NSN FLEXI EDGE BTS (INDOOR AND OUTDOOR).
** Fault finding and rectification Of NSN BTS and TX equipments.
** Routing the E1 paths for BTS from BSC for all Cell Sites of PDH/SDH Node.
** Making SNCP of sites (providing loop protection of sites).
** Defining and checking External alarms, and site AT done.
** Installation and commissioning of SDH equipments (MW and IDU) for Airtel Bharti Maharashtra ltd.
** Hard Patching E1 from BSC-MUX to the desired site and gives it to BTS.
** Hop alignment of NEC SDH NEO (1+0 and1+1), and NSN Flexi Hybrid (2+0 and 1+0) and make a ring of mw alignment.
** Antenna System Tests-Performing a Calibration, Distance-to-Fault (DTF) and VSWR measurements using site master.
** Experience on GSM 0.3m, 0.6m.1.2m & 1.8m microwave antenna and 1+0 and 1+1, 2+0, radio configuration.
Work on project :
ERICSSON : IDEA-MAHARASTRA Circle
ZTE : UNINOR- MPCG Circle
HUAWIE : AIRCEL-MAHARASTRA Circle
NSN : AIRTEL BHARTI-MAHARASTRA Circle
AIRCEL-RAJASTHAN Circle.
TATA 3G-RAJASTHAN Circle
Technical Skills :
ERICSSON :
** Transmission Equipments -Minilink –BTS Indoor & outdoor – RBS (2964, 2954,) (Both 900 & 1800 MHZ).
** TEST TOOLS -OMT (Operation & Maintenance Terminal), MSM (Minilink System Manager),
ZTE :
** RBS Equipments-8800.
** TEST TOOLS** LMT for BTS
HUAWEI :
** RBS Equipments-3900,3900A
Training :
PTID NO.
OF NSN – ZEPP/TL3/044044
** PTID Training of NSN system.
** WCDMA (NODE-B) training of NSN system.
** Training on Ericsson system (BTS, Minilink).
TRAINING PROFILE : Training was provided to give thorough knowledge in the principles and technologies of wireless communication systems such as RF SURVEY, RF PLANNING, GSM, and Installation.
Area of Professional interest :
** GSM Technology
** E1, SDH components of GSM.
** Digital circuit and Design
** Project Development and Management
** Telecommunication (wireless and mobile).
Academic Credentials :
** BE (E & C) from TRUBA Institute of Engineering & Information Technology Bhopal M.P. in the year 2007 with 64.8%.
** 12th from M.P BOARD in the year 2002 with 62.81%.
** 10th from M.P BOARD in the year 2000 with 66.20%.