RESUME :
PERSONAL INFORMATION :
BIRTH DATE :21TH AUGUST 1989
MARITAL STATUS :MARRIED
LANGUAGE KNOWN :GUJARATI, HINDI, ENGLISH.
PROFESSIONAL OBJECTIVE :
TO WORK WITH AN ORGANIZATION WHERE MY SKILLS CAN BE UTILIZED EFFECTIVELY TO ACHIEVE ORGANIZATIONAL OBJECTIVES WITH OPTIMAL RESOURSE UTILIZATION STRATEGY & MAINTAINING PROFESSIONAL ETHIES.
EDUCATIONAL QUALIFICATION :
SR NO. EXAM PASSED YEAR OF PASSING BOARD /UNIVERSITY PERCENTAGE RESULT :
1. S.S.C. MAR2004 G.S.E.B. 80.00 DIST
2. DIPLOMA ELECTRICAL APRIL2007 M.S.UNIVERSITY 64.14 FIRST
3. GRADUATION RUNNING K.S.O.U
SOFTWARE KNOWLEDGE :
** PLC & SCADA PROGRAMMING (ALLEN BREADLY)
** C, C++
** MICROSOFT OFFICE (WORD, EXCEL,,POWER POINT).
EXPERIENCE :
AT PRESENT I AM WORKING WITH. JNA ELECTRICAL PVT. LTD :
ALKAPURI, VADODARA, GUJARAT , AS A SITE IN-CHARGE. SINCE JULY’ 2007
I HAVE COMPLETED MANY PROJECTS OF EXPANSION,ELECTRIFICATION AND ARC JOBS IN SUCH COMPANIES LIKE :
SEW EURO DRIVE INDIA PVT LTD, POR, VADODARA : (Manufacturing unit of Motors and Gear box)
LINK PHARMA LTD, NANDESARI, VADODARA : (Chemical processing Unit)
HALDYN GLASS GUJARAT LTD, GAVASAD, VADODARA : (Manufacturing unit of Glass Bottles)
SCHOTT GLASS INDIA PVT LTD, ANKHI, JAMBUSAR : (Manufacturing unit of Glass tubes)
TUFLEX INDIA PVT LTD, PALEJ, BHARUCH : (Manufacturing unit of Nylon Net)
CADILA PHARMACUTICALS LTD, ANKLESHWAR : (Manufacturing unit of Medicines and chemicals)
GULBRANDSEN TECHNOLOGIES INDIA PVT LTD, JHAGADIA : (Chemical processing unit)
ABELLON CLEAN ENERGY LTD, GHANDIDHAM : (Manufacturing unit of wooden blocks for boiler)
>
RAJASHREE POLYFILS LTD, UMALLA, BHARUCH : (Manufacturing unit of Polyester yarn, Nylon chips and Nylon tyre cord)
FLOURISH PUREFOOD PVT LTD,MODASA,SABARKANTHA : (A dairy farm and BMC unit with capacity of 1000 cows)
KEY SKILLS :
I HAVE KNOWLEDGE OF"
** ERECTION, INSTALLATION AND COMISSIONING OF HT/LT TRANSFORMER (VOLTAMP, ABB, SIEMENS MAKE).
** INSTALLATION OF 11 KV DOUBLE POLE STRUCTURE WITH GOD SWITCH.
** HT CIRCUIT BREAKERS (VACCUM CIRCUIT BREAKER,SF6 CIRCUIT BREAKERS,AIR CIRCUIT BREAKERS).
** PCC PANELS, MCC PANELS, APFC PANELS, AMF PANELS, UPS PANELS, PDBs, LDBs, UPS, BATTERY BANK ETC.
** INSTALLATION OF DG SETS.
** MOTORS ERECTION,TESTING AND COMMISONING.
** EARTHING SYSTEM WORK (COPPER/GI/CI PLATE EARTHING,PIPE ELECTRODE EARTHING, CHEMICAL EARTHING).
** CABLE TRAY WORK (GI LADDER TYPE TRAY,GI PERFORATED TYPE TRAY).
** HT/LT CABLE LAYING (FINOLEX, POLY CAB, AVO CAB MAKE).
** CABLE GLANDING AND TERMINATION (SINGLE COMPRESSION TYPE,DOUBLE COMPRESSION TYPE, PG GLANDS).
** HT AND LT JOINTING KIT (M-SEAL AND RAYCHEM MAKE).
** STREET LIGHT POLE AND PLANT LIGHTING AND MAINTANENCE.
** INDUSTIAL & DOMESTIC LIGHTING.
** PROJECT PLANNING, MEN POWER HANDLING, MATERIAL HANDLING, AND BILLING.
JOB DESCRIPTION :
** CO-ORDINATION WITH VARIOUS IN-HOUSE AND EXTERNAL AGENCIES LIKE CLIENT, VENDORS, SUB CONTRACTORS, DESIGN DEPARTMENT, PRODUCTION, ACCOUNT AND SERVICE DEPARTMENT FOR TIMELY AND SATISFACTORY COMPLETION OF PROJECT.
** RESPONSIBLE TO REVIEW DRAWINGS
** PROCUREMENT ACTIVITIES THAT INCLUDE FOLLOW-UPS AND DISPATCH OF MATERIALS.
** PLANNING AND EXECUTING THE ELECTRICAL AND UTILITY INSTALLATION AND COMMISSIONING ACTIVITIES.
** ENSURE QUALITY EXECUTION OF WORK AS PER THE DESIGN STANDARD/DRAWING.
** PROJECT PROGRESS REPORTING TO HIGHER MANAGEMENT AND CUSTOMER.
** RESPONSIBLE FOR MEASEUREMENT AND BILL CERTIFICATION.
** RESPONSIBLE FOR OVERALL SMOOTH AND TIMELY EXECUTION OF THE PROJECT.