ï Raw material received on SAP bases (ECC 6.0)
ï GRN (Goods Received Note) prepare.
ï Invoice booking in APMS software. After booking invoice hand over SSC department.
ï Materials offered Quality department. After “QC” design materials sent on main
storage location. And rejected materials sent back to supplier.
ï Materials shift receiving section to main storage location. Shifting materials related
all problems solving.
ï Shift materials transfer by SAP system.
CARRIER OBJECTIVE:-
WORK EXPERIENCE:-
JOB RESPONSIBILITIES:-
ï Main storage location update on monthly bases.
ï Main warehouse storage visuals and part identification label maintain properly.
ï Location implementation new development and sample parts.
ï All required materials for production is available on production line in advance as per
received annexure.
ï BOM correction regarding follow up with engineering team.
ï Ensure that all slow / non-moving inventory and obsolete parts is right off
from the system and physically removed.
ï SIS posting and stock transfer in plant to plant.
ï Prepare RGP and NRGP.
ï Inventory control.
ï Maintain 5s properly warehouse allotted area.
ï Proper follow First in First out (FIFO) methods of issuing in case of material that have
self- life constraints to avoid expires and changes of properties.
ï Wall to wall inventory counting.
ï Monthly perpetual inventory count
ï Chemicals area proper handling.
ï Spill management.
ï M.S.D.S displayed proper location.
ï Proper PPE training all temps.
Manpower.