PROFESSIONAL OBJECTIVE:
Seeking a suitable position in Project Construction/ Maintenance Management with the specialization of Oil & Gas Industry where my professional experience and education will allow me to make an immediate contribution as an integral part of a succession organization.
Concise Profile:
** Around 3years of experience in Oil & Gas Domain
** Proven ability to study the client’s requirement and finding the scope of work & review technical specification and equipment scheduling of the projects.
** Working experience in preparing the Cost Estimation and Technical Proposals as per the Project requirements.
** Working as a Project Engineer for various projects like Pipeline/Maintenance /construction structure.
** Knowledge in AUTOCAD, Project Estimation.
** Ability to read/ understand all sort of Pipeline isometric ,Structural drawing and Material take off
** Strong analytical skills, ability to understanding the methods and techniques for managing multiple projects simultaneously.
Educational Qualification:
** A First class Graduate in Bachelor of Engineering in Mechanical Engineering from
(Dr. Mahalingam College of Engineering & Technology), Anna University, Chennai, India, 2008.
** A First Class with Distinction in Higher Secondary (+2), Tamil Nadu Board of Examinations ,2004
** A First Class in SSLC (10th), Tamil Nadu Board of Examinations,2002
Computer Skills:
Drafting Tool : AutoCAD 2004
Operating system : Windows Windows-98, 2000, XP
Application : Microsoft Office
Work Experience:
Company name Experience Company Type Designation
Muslat Hammad Al .OTAIBI, Dammam, Kingdom of Saudi Arabia May 2009 - Till date Oil & Gas industry Mechanical Engineer
Procyon Systems Pvt. Ltd, Chennai, Tamilnadu,INDIA July 2008 – March 2009 Engineering Design Services Graduate Trainee (Intermediate Quality Control)
Professional Experience:
1. Presently working as a Mechanical Engineer at Muslat Hammad Al- Otaibi, Dammam, Kingdom of Saudi Arabia. Project Client: Saudi Arabian oil company (Saudi Aramco), KSA
Job Responsibilities:
** Attending the Client’s Job Explanation Meeting.
** Study the client documents, identify scope of works and review technical specification and equipment schedule of the projects
** Conduct site investigation to identify and access details of scope.
** Preparing Cost estimation & Preliminary Bill of Material. (BOM) .
** Analyzing & preparing material take off
** Receives and evaluates of tenders and enquiries
** Preparing technical comparison as per the project specification and cost comparison for selection of approved material (Good Quality Product) form the right supplier
** Negotiations with the supplier to reduce the cost of the project
** Do pricing for the complete project as per company’s pricing format
** Preparing technical proposal.
** Prepare detailed cost estimates from conceptual stages and process them till finalization
** Final bid preparation, discussion with senior level management for tender price finalization
** Over all responsible for all the engineering and procurement activities including preparation of material requisition, co-ordination with vendors, review of technical offers, preparation of technical recommendation, purchase requisition.
** Review / approval of vendor drawings.
** Preparation & submission of material data sheet for consultant’s approval.
** During work preparation stage, Review the specifications, drawings, technical instruction
** Attend Internal Kick-Off Meetings & hand over all the contract documents to the Project supervisor& clarifies all doubts, as and when required
** Project Monitoring/ Supervision, providing related to technical assistance to the concerned Project supervisor.
** Supervise Fabrication team to ensure quality and safety
** Preparation of progress reports & coordinating with client.
** Preparation of as- built drawings related to Project Work
** Checking and monitoring the progress to improve the process to achieve company goal.
** Ensure employees are trained and knowledgeable in current work processes
** Materials and manpower management.
** Procurement of materials required.
** Keeping track of invoicing and payment for the all projects based, Accepted terms and conditions with clients.
LIST OF PROJECT HANDLED:
** Multi-phase flow meter installation (Its include different Sizes of pipes) at Aindar Gosp-2, Aindar Gosp1, shedgumGosp-3 (Gas and oil Separation producing Plants) Saudi Aramco from July 2010 to July 2011.
** Relocate /modify of Scraper Trap Facilities at Shed gum WIP2, Saudi Aramco From July 2010 to April 2011
** Test and Inspection program 2010-2011 for Dhahran Central A/c Plants at Dhahran ,Saudi Aramco From 0ct 2010 to May 2011
** Replacements of 10", 14",16", 20" diameter on plot Trunk lines and flow lines at Uthmaniyah Gosp10 ,Saudi Aramco from Nov 2010 to Mar 2011
** Test and Inspection program 2010-2011 for Dhahran Central A/c plants Saudi Aramco From 0ct 2009 to May 2010
** Test and Inspection of Raw Water Tank at R.O Plant at Dhahran, Saudi Aramco From may 2010 to Aug 2010
** Repair spectacle Blinds at NGL Plant at Abqaiq ,Saudi Aramco From June 2010 to Sep 2010
** Implement Spectacle Blinds Recommendations at Abqaiq NGL plant ,Saudi Aramco March 2010 to Aug 2010
** Inspect & Repair Modules 26, 27& 28 at Qurayyah Sea Water Treatment Plant ,Saudi Aramco From Mar 2010 to Sep 2010
** Module #4 Deaerator, filters and discharge headers mechanical work at Qurayyah Sea Water Treatment Plant, Saudi Aramco From March 2010 to May 2010
** Mechanical Work , Module #7 at Qurayyah Sea Water Treatment Plant, Saudi aramco from Jan 2010 to Feb 2010
** Replacement of 56" Ball valve at Qurayyah Sea Water Treatment Plant, Saudi Aramco from April 2010 to April 2010
** Upgrade/construct shop for hydro testing and Welding by Pre –Engineering Building at Abqaiq, Saudi Aramco From Sep 2009 to Aug 2010
** Install additional H2s Detector at Abqaiq Gosp 3( Gas and oil Separation producing Plants ) Saudi Aramco From Sep2009 to Dec 2009
** Module #1 Deaerator,Filters and Discharge headers , Mechanical Work at Qurayyah Sea Water Treatment Plant, Saudi Aramco From Oct 2009 to Dec2009
** Module #11 Deaerator, Filters and Discharge headers, Mechanical Work at Qurayyah Sea Water Treatment Plant, Saudi Aramco From Oct 2009 to Nov 2009
** Module #20 ,21, 22 Initial Testing and inspection Scope of Work at Qurayyah Sea Water Treatment Plant, Saudi Aramco From May 2009 to Nov 2009
** Install/modify platform at Abqaiq Gosp 3, 5, 6, Saudi Aramco from June 2009 to Sep 2009.
2.
Previous Experience:
From July 2008- March 2009, Worked as Graduate Trainee (Intermediate Quality Control) at Procyon Systems Pvt. Ltd,(Engineering Design Services), Chennai, Tamilnadu.
Job Responsibility:
** Preparing the Pipe Line list , Vessel and equipment list from P & I D drawing
** Comparing Bill of material from 3D model and P& ID drawings
** Comparing Isometric drawing with P& ID drawings
** Checking Line clash and Line break from 3D model design
** Checking Valve , Fitting ,Pipe specification with Material List
** Modifying /Drafting 2D drawings
Certification Courses Done:
** Saudi Aramco Work permit receiver course 2009 by Saudi Arabian oil company (Saudi Aramco) valid till Oct 2011
** Piping Design And Drafting by Procyon System Pvt. Ltd Chennai, 2008
** AUTOCAD 2004, Certified by ACCEL Academy, 2008
** ANSYS , Certified by QUEST Academy, 2007
** Diploma in KAIZEN PROGRAMME, Certified by TUV Rheinland Group (India) ,2006
Conference Attended:
** Attended Certificate Safety Orientation course in Emergency Response Plan by Saudi Aramco valid till June 2012
** Participated in the Safety Program which was conducted by Saudi Aramco ,Dhahran,KSA
** Participated in the National Seminar on March 2004 ,conducted at Dr.Mahalingam college of Engineering & Technology , Pollachi
** Attended “Total Quality Management” workshop” held on 13th July2007, organized by Dr.Mahalingam College Of Engineering & Technology , Pollachi
Professional Membership:
** Member in SAE INDIA (Society of Automobile Engineer), Chennai. Membership No-7060645826
Strengths
Enthusiastic and Self-motivated achiever.
Practiced at juggling multiple tasks in a high-pressured environment.
Strong sense of punctuality.
Problem-solving skills.
Team Work