Career Objectives: - Looking for an excellent opportunity to work as engineering manager where my management and engineering skill will come into use.
EDUCATION & COMPUTER KNOWLEDGE: -
Education : B.E. (Mechanical), Madras University,
Computer Knowledge : MS Office, MS Primavera P6, knowledge in AutoCAD
PROFESSIONAL STATUS:-
Over 14 years experience in mechanical construction field.( Fabrication and erection of utility piping and structural, Storage tanks and equipments and Fire fighting and plumbing system.). Specialization in construction drawing such as GAD, P & I, preparation of Pneumatic testing and hydro testing. Responsible for taking correct and proper decisions during projects. Able to work under pressure and independently.
EXPERIENCE:
Project In charge(11.01.2010 to 10.08.2012)
M/s. Samsung Heavy Industries Co., Ltd.,
Owner: Samsung India Electronics Pvt. Ltd.,
Project 1: Heat Exchanger plant, Refrigerator plant
Chennai.
Fabrication and erection of utility piping, Fire fighting system and plumbing, Erection of LPG,O2 and N2 storage tank, 850Kg/hr. LPG Fired Boiler, Air cooled liquid Chiller (200TR), Double skin horizontal floor mounted Air handling unit(AHU),Oil inject Air screw compressor, Co2 flooding system and STP system.
Project 2: Mobile plant-Expansion, and Canteen expansion.
Samsung India Electronics Pvt. Ltd.,
Noida, U.P.
Fabrication and erection of utility piping, plumbing and fire fighting system, HVAC system (Air cooled chiller-375TR & AHU), RO system (25m3/hr),
Co2 flooding system and STP (350Ton/Day) and LPG piping.
Responsibility:
Tool Box meeting
In charge for mechanical activities.
Daily progress report
Contract negotiation and preparing PO
Responsible for supervising sub-contractors, suppliers and vendors who are working at the site.
Responsible for observing the installation process till the completion.
Conduct the pneumatic and hydro testing.
? Senior Engineer (06.10.2006 to 05.09.2009)
M/s. Samho Gunyoung Construction Pvt. Ltd.,
Client: AMCO.
Owner: Hyundai Motors India Ltd.,
Project: Hyundai plant, Phase ll, Chennai.
Fabrication and erection of utility piping, Plumbing and Fire fighting system, Air washer system, Steam, gas and oil line for Body shop, Assembly shop & Engine shop.
Hyundai Heavy Equipment and Construction India Pvt.Ltd, Pune.
Fabrication and erection of utility piping and gas line in assemble shop and production shop.
Responsibility:
Tool Box meeting before start the work.
Handled team of workers and engineers.
Making schedule for whole week and report to manager.
Contract negotiation.
Good Housekeeping and safety measures taken at the work area.
Preparation of Hydro testing and air testing.
Hand over the job to client as per drawings.
? Execution Engineer (28.12.2003 to 30.07.2006)
M/s. SPIC JEL Engineering Construction Ltd.,
Client: Technip KT India Ltd., IOTL, TOYO Engineering ltd., & Air oil gas (I) ltd.
Project1: Naphtha Splitter Unit.
Fabrication and erection of piping, fabrication of heavy column structure,firefighting system and sprinkler for storage tanks, Fabrication and erection of Flare stack supporting structure with 50MT Water seal drum and flare tip.
Project 2: Ethylyne storage tank facilities.
Client: Technip India ltd.
Owner: Chemplast Sanmar Ltd, Karaikal.
Fabrication and erection of cross country piping(1.3km from LFP),Erection of in plant piping and pipe supports, Erection of equipment,Erection of Flare stack supporting structure with drum flare tip and piping
Responsibility:
Tool box Meeting
Allocating the works to the workers.
Deploy the manpower, Scheduling and monitoring the activities.
Co-ordination with the client, Consultant,
Owner, Sub-contractor and site Management.
Before erection starts, checking all the aspect in safety concern along with clients.
Daily make sure the Target got done and report to the Manager.
Hydro testing and Pneumatic testing of piping.
? Senior Engineer (01.04.2002 to 22.09.2003)
M/s. Prasanna Engineering Corporation
Client: L & T Ltd.,
Owner: Madras Atomic Power Station, Kalpakkam.
Project 1: Removal of old pressure tube and installation of new pressure tube in reactor, ENMASS Coolant Channel replacement in Unit II
Project 2: Dismantling, refabrication and erection of conveyor structure column (18mtr.Length and elevation between +17.54m and +38m conveyor gallery).Neyveli Lignite Corporation (NLC),Thermal station-II,Neyveli.
Responsibility:
Responsible for supervising subcontractor supervisor and works who are working on the plant
Work execution and training the man power.
? Piping Engineer (01.09.2001 to 31.03.2002)
M/s. Sakthi Hi-Tech Construction Pvt. Ltd., Chennai.
Client: Jacobs H & G pvt. Ltd.,
Owner: Marico
Project: Fabrication and erection of steam line, oil line and water line.
Coconut oil extraction plant, Pondicherry.
Responsibility:
Co-ordination with client, sub contractor
Installation of equipments
Hydro testing and Final Billing.
? Planning Engineer (10.11.1998 to 12.07.2000)
M/s. Texcel Engineers pvt. Ltd., Chennai.
Client: Bharat Heavy Electrical Ltd., (BHEL)
Owner: National Thermal power corporation(NTPC)
Project: Combined Cycle power project (HRSG),
Faridabad, Haryana.
Commissioning, testing and trial run of 2 X 231 TPH Heat recovery steam generator- 2 X 70MW capacity.
Unloading, erection, alignment of 2 X 18MT LP drum and 2 X 100MT wt. of HP drum with 2 X 70mtr. Height of chimney, heavy structure column with modules.
Responsibility:
Conduct the Tool box meeting.
Co-ordination with site engineer to carryout erection activities and daily progress report.
Material requisition as per drawing.
Hydro testing and pneumatic testing.
Billing and hand over the system to client.
? Erection Engineer (05.05.1997 to 25.09.1998)
M/s.Prumatect Services pvt.ltd. Chennai.
Client: JINDAL vijay nagar steel plant.
Project: Heavy equipment plant, Bellary.
Unloading, erection and alignment of Radial drilling machine, Boring machine, Heavy duty turret lathe, CNC milling machine.
Responsibility:
Co-ordination with client.
Preparation the job for erection as per the erection method statement & executing the job.
? Site Engineer (21.01.1996 to 28.02.1997)
M/s Dowel Erectors pvt. Ltd., Chennai.
Client: Bharat heavy plate and vessels ltd.,
Project: LPG Storage plant IOCL, Kandla, Gujarat.
Fabrication and erection of inter connecting and cross country piping, Flare stack supporting structure with piping.
Responsibility:
Daily progress report updating.
Material requisition as per requirement.
Billing.
? Site Engineer (05.10.1994 to 22.12.1995)
M/s. Gen power Engineers pvt. Ltd., Chennai.
Client: Wartisila Diesel Ltd.,
Owner: India Cements Ltd.,
Project: Erection and alignment of6MW Diesel Generator, Cuddapah, Andra.
Unloading, Erection and alignment of 6MW Diesel generator with erection of chimney and Diesel storage tank.
Responsibility:
Daily progress report.
Co-ordinate with workers.
DECLARATION:
I hereby declare that the above furnished details are true to the best of my knowledge.
Date:
Place: Pondicherry. S.EDWARD KENNEDY