Piratla Subba Rao Narsimha Setty
C/o Binod kumar satapathy,
S/o LateP.Krishna Murthy,
Visakhapatnam
Tel No. - 0891- 6510263 .
Mob : - +91 –9439877922 / 9861124453
E-mail- setty1973 AT gmail.com psrnsetty AT yahoo.com
Strength :
Follow up of QAP,PQR,WQR,FIR, and Layout, Fit up, Welding checking, dressing, painting and final inspection and Non – Destructive Testing (Suchas RT, UT,MPT,DPT)
Academic Qualification :
Diploma in Mechanical Engineering from Kalinga University, Chattisgarh in 2005.
I.T.I in Fitter from Bharat I.T.I Andhra Pradesh (National Council of Vocational).in 1992.
S.S.C from Board of Higher Secondary Education Andhra Pradesh in 1990.
P.U.C from Andhra University in 1993.
Professional Qualification :
N.D.T (Level-II in RT, UT, PT, MT) From Kalva Institute of NDT & Quality Management Secundarabad in 2003.
Total Experience : 19 Years 01months (DME 8 Years)
1. Safess Quality Management Pvt. LTd. as SITE IN -CHAR 12th Dec’1994 to 30th April’ 2005 :
As Inspection & SMPV RULES of Pressure Vessels. Periodical inspection of Bullets & Horton spheres AT HPCL, BPCL, ONGC, GAIL, and KRL.
NDT Repair and Modification at Periodical inspection of Bullets & Horton spheres.
During this period Handled and witness of RT, PT, MT, Hardness Testing, Hydro Testing, Thickness survey, Safety valve Testing was carried out.
Shout down{NDT} work at KRL, CPCL, MC&L, FACT etc.
2. Bhushan Power & Steel Ltd as“Jr. Engineer” Project (Mechanical) 7th June'2005 to 15thfeb2010. :
Fabrication of SMS–II & CSP (Layout, Fit up, Welding checking, dressing, painting and final inspection) with Third Party inspections (Bureau veritas) ofFabrication & erection checking and fir issued to contractors.
Follow up of different Type of Non – Destructive Testing (Such as UT, and PT), Conduct and Client Witness. Heavy structures & light structures.
Erection of SMS (Assemble time, N.D.T, after erection, Alignment, Final painting) with Third Party inspections (Bureau veritas) and billing of checking for the contractors, for the smooth running of the project work.
various Structures as Per Daily Inception Bases and F.I.R Issued And final Reports Of Heavy structures & light structures, Pipe lines, Pressure pipe lines Like as : SMS–II ,2 x 130 MW Captive Power House Building, Lime kiln, Dri kiln, RMPP etc as a QA/QC Co-coordinator .
3.
Bhushan Steel Ltd asas“Sr. Engineer’’ Q/C Project (Mechanical) 17th Feb'2010 to 15th Oct 2011. :
Fabrication of SMS–II Fabrication and erection of BOF SITE. (Layout, Fit up, Welding checking, dressing, painting and final inspection) with Third Party inspections (DTC) ofFollow up of different Type of Non – Destructive Testing (Such as RT, UT, and PT), Conduct and Client Witness. Heavy structures & light structures.
4. HAJE. AP.BAVA as“Sr. Engineer’’ Q/C Project (SMS&LDP)From 17th OCT 2010to 06th March 2011 :
QA/QC Planning of Fabrication and Erection of SMS–II& LDP.
With Third Party inspections (Bureau veritas) Follow up of QAP,PQR,WQR and Layout, Fit up, Welding checking, dressing, painting and final inspection) and Non – Destructive Testing (Such as RT, UT, and PT), Conduct and Client Witness.
5. Bhushan Steel Ltd as’’ Sr. Engineer” Q/C Project / Mechanical. From 09th March 2011 to till date :
Fabrication of SMS–II Fabrication of BOF SITE (Layout, Fit up, Welding checking, painting and final inspection) with Third Party inspections (DTC).
Follow up of different Type of Non – Destructive Testing (Such as RT, UT, and PT), Conduct and Client Witness.
Personal Details : -
Father's Name : Late P. Krishnamurthy
Date of Birth : 04-04-1973
Sex : Male
Nationality : Indian
Religion : Hindu (ysysa)
Marital Status : Married
Languages Known : English, Hindi, Telugu, and Tamil.
Passport Details :-
Passport no Z2972879
Place of Issued Bhubaneswar
Date of Issued 16/05/2014
Date of expiry 15/05/2024
Declaration :
I hereby declare that the above statements are true to the best of my knowledge and belief.
Date :
Place :
(Piratla.S.R.N. Setty)